Exam 3: Statistical Process Control
Exam 1: Introduction to Operations and Supply Chain Management102 Questions
Exam 2: Quality Management88 Questions
Exam 3: Statistical Process Control157 Questions
Exam 4: Product Design95 Questions
Exam 5: Service Design91 Questions
Exam 6: Processes and Technology81 Questions
Exam 7: Capacity and Facilities Design128 Questions
Exam 8: Human Resources131 Questions
Exam 9: Project Management106 Questions
Exam 10: Supply Chain Management Strategy and Design72 Questions
Exam 11: Global Supply Chain Procurement and Distribution122 Questions
Exam 12: Forecasting92 Questions
Exam 13: Inventory Management127 Questions
Exam 14: Sales and Operations Planning123 Questions
Exam 15: Resource Planning97 Questions
Exam 16: Lean Systems88 Questions
Exam 17: Scheduling96 Questions
Select questions type
If the quality of a process's output is determined by classifying the output as being defective or not defective, use a(n) ___ control chart.
(Multiple Choice)
4.9/5
(40)
Employee training in statistical process control is a fundamental principle in total quality management programs.
(True/False)
4.9/5
(28)
Which of the following control charts is used to control the variation within samples?
(Multiple Choice)
4.9/5
(33)
Special cause variation in a process is more likely to be detected with
(Multiple Choice)
4.8/5
(38)
Typically, the operating characteristic curve shows the following on the horizontal and vertical axis (answers are given as horizontal axis and vertical axis respectively):
(Multiple Choice)
4.9/5
(37)
There are several general guidelines associated with the zones for identifying patterns in a control chart, where none of the observations are beyond the control limits. Which of the following is NOT one of those guidelines?
(Multiple Choice)
4.8/5
(38)
With a single-sample attribute plan, only one of the items randomly sampled from a lot is inspected.
(True/False)
4.8/5
(34)
Assume that a process is operating on target and 99.8% of the products manufactured just fit within the specification limits. What can you say about the process?
(Multiple Choice)
4.8/5
(32)
If ?σ is the population standard deviation, k the number of samples or subgroups, and n the sample size (number of observations in each subgroup), what is the distance from the centre line to the upper control limit?
(Multiple Choice)
4.8/5
(39)
If the points plotted on a control chart display a pattern, it is called a run.
(True/False)
4.8/5
(30)
All processes contain a certain amount of variation in their output.
(True/False)
4.7/5
(38)
Six Sigma companies report defective parts per million (PPM) versus the more traditional defective parts per hundred.
(True/False)
4.8/5
(36)
Design specification limits should always be wider than the control limits for a given process.
(True/False)
4.9/5
(25)
The formula used to determine the upper and lower control limits is based on specification limits.
(True/False)
4.8/5
(43)
Special cause variation can be identified using statistical process control.
(True/False)
4.9/5
(34)
Showing 101 - 120 of 157
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)