Exam 15: Just-In-Time and Lean Production
Exam 1: Introduction to Operations Management47 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity44 Questions
Exam 3: Demand Forecasting62 Questions
Exam 4: Product Design54 Questions
Exam 5: Strategic Capacity Planning53 Questions
Exam 6: Process Design and Facility Layout59 Questions
Exam 7: Workjob Design53 Questions
Exam 8: Location Planning and Analysis45 Questions
Exam 9: Management of Quality48 Questions
Exam 10: Statistical Quality Control48 Questions
Exam 11: Supply Chain Management55 Questions
Exam 12: Inventory Management40 Questions
Exam 13: Aggregate Operations Planning and Master Scheduling46 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning53 Questions
Exam 15: Just-In-Time and Lean Production38 Questions
Exam 16: Job and Staff Scheduling42 Questions
Exam 17: Project Management61 Questions
Exam 18: Waiting-Line Analysis38 Questions
Exam 19: Answers to Selected Problems52 Questions
Exam 20: Tables7 Questions
Exam 21: Working With the Normal Distribution49 Questions
Select questions type
JIT type approaches have many different names. High capacity operations are a:
(Multiple Choice)
4.8/5
(35)
Many companies implementing lean have consistent pay structures that do not differentiate
between full-time staff and hourly rated staff.
(True/False)
4.9/5
(33)
JIT type approaches have many different names. Short cycle time manufacturing is a :
(Multiple Choice)
4.9/5
(37)
Which of the following is NOT a major method of achieving the transfer of internal set-up work to external work?
(Multiple Choice)
4.9/5
(34)
The just-in-time approach assumes that each stage in the manufacturing process will place the
parts it produces in an inventory that buffers that stage from the next one downstream in the total
process.
(True/False)
4.8/5
(29)
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?
(Multiple Choice)
4.8/5
(40)
What is the term given to the kanban used to signal to a previous stage that material can be withdrawn from inventory and transferred to a specific destination?
(Multiple Choice)
4.8/5
(31)
Depending on the type of kanban being used, the principles applied will vary.
(True/False)
4.8/5
(34)
Producing goods and services exactly when they are needed - not before they are needed, so they wait as inventory, nor after they are needed, so customers have to wait - is called:
(Multiple Choice)
4.9/5
(35)
The 'lean' concept has much wider implications for improving operations' performance beyond
planning and control issues.
(True/False)
4.8/5
(32)
Which of the following methods is NOT used to reduce set-up time in the lean approach?
(Multiple Choice)
4.9/5
(40)
Is the following statement characteristic of MRP or JIT.Planning and control concepts are only part of a wider philosophy.
(Multiple Choice)
4.8/5
(33)
In lean it is usual to use one specialist large machine rather than several small machines.
(True/False)
4.9/5
(28)
Showing 21 - 38 of 38
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)