Exam 9: Work Design and Measurement
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness70 Questions
Exam 3: Forecasting139 Questions
Exam 4: Product and Service Design78 Questions
Exam 4: RELIABILITY – Static12 Questions
Exam 6: Strategic Capacity Planning for Products and Services85 Questions
Exam 7: Decision Theory– Static114 Questions
Exam 8: Process Selection and Facility Layout132 Questions
Exam 9: Work Design and Measurement129 Questions
Exam 10: learning curve– Static61 Questions
Exam 11: Location Planning and Analysis62 Questions
Exam 12: The Transportation Model– Static20 Questions
Exam 13: Management of Quality97 Questions
Exam 14: Quality Control112 Questions
Exam 15: Acceptance Sampling– Static51 Questions
Exam 16: Aggregate Planning and Master Scheduling74 Questions
Exam 17: MRP and ERP81 Questions
Exam 18: Inventory Management128 Questions
Exam 19: JIT and Lean Operations79 Questions
Exam 20: Maintenance– Static36 Questions
Exam 21: Supply Chain Management87 Questions
Exam 22: Scheduling98 Questions
Exam 23: Project Management113 Questions
Exam 24: Management of Waiting Lines64 Questions
Exam 25: Linear Programming93 Questions
Select questions type
Which sample proportion will require the largest number of work sampling observations for a given confidence level and allowable error?
(Multiple Choice)
4.9/5
(37)
The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?
(Multiple Choice)
4.8/5
(36)
Time-based systems compensate employees according to the time they have worked and the amount of output they produce.
(True/False)
4.9/5
(41)
The design of work systems typically involves:
I. work measurement.
II. job design.
III. compensation.
IV.the use of outside consultants.
(Multiple Choice)
4.9/5
(33)
The manager of Lawn and Garden Services would like to estimate the proportion of her employees' time spent performing various gardening and lawn care activities. She has made 400 random observations of a typical worker, with the following results: Activity Time Observed Mowing 200 Trimming 80 Raking 40 Miscellaneous 80
What is the most likely true proportion of time spent mowing?
(Multiple Choice)
4.9/5
(36)
A standard time is the amount of time it should take a fully trained and qualified worker to complete a specific task, working at an efficient, yet sustainable pace, using their choice of methods, tools, equipment, and workplace arrangement.
(True/False)
4.7/5
(32)
The chart used to review the overall sequence of an operation by focusing on the movements of either the operator or materials is called a:
(Multiple Choice)
4.9/5
(35)
The manager of Lawn and Garden Services would like to estimate the proportion of her employees' time spent performing various gardening and lawn care activities. She has made 400 random observations of a typical worker, with the following results: Activity Time Observed Mowing 200 Trimming 80 Raking 40 Miscellaneous 80 If the manager wants to be 95.44 percent confident that the true proportion of time spent mowing is within .02 (plus or minus) of the sample proportion, what should be her sample size?
(Multiple Choice)
4.8/5
(28)
One therblig is the equivalent of one hour of sustained work by one average person.
(True/False)
4.9/5
(38)
A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results: Observation 1 2 3 4 5 6 Time(Seconds) 46 38 40 34 42 40 What is the normal time for this task if the employee worked at a 20 percent faster pace than average?
(Multiple Choice)
4.8/5
(28)
A worker-machine chart can help identify nonproductive parts of a process.
(True/False)
4.7/5
(39)
Self-directed teams often are great sources of information regarding improvements to work processes.
(True/False)
4.7/5
(36)
A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results: Observation 1 2 3 4 5 6 Time(Seconds) 46 38 40 34 42 40 What is the observed time for this task?
(Multiple Choice)
4.9/5
(25)
A behavioral approach to job design in which workers periodically exchange jobs is known as:
(Multiple Choice)
4.7/5
(40)
The owner of Kat Motel wants to develop a time standard for the task of cleaning a cat cage. In a preliminary study, she observed one of her workers perform this task six times, with the following results: Observation 1 2 3 4 5 6 Time(Seconds) 99 87 90 81 93 90 What is the observed time for this task?
(Multiple Choice)
4.7/5
(43)
The owner of Touchdown Sports Bar wants to develop a time standard for the task of mixing a specialty cocktail. In a preliminary study, he observed one of his bartenders perform this task seven times with an average of 90 seconds and a standard deviation of five seconds.
What is the standard time for this task if the bartender worked at a 20 percent faster pace than is average, and an allowance of 10 percent of job time is used?
(Multiple Choice)
4.9/5
(42)
The motion study chart which describes the movements of both hands at the same time is a:
(Multiple Choice)
4.9/5
(43)
Ergonomics is an important part of job design to consider for factory work but not for office work.
(True/False)
4.9/5
(34)
The technique which can be used to estimate the percentage of time a worker or piece of equipment is idle is known as: