Exam 3: Process Choice and Layout Decisions in Manufacturing and Services
Exam 1: Introduction to Operations and Supply Chain Management62 Questions
Exam 2: Operations and Supply Chain Strategies57 Questions
Exam 3: Process Choice and Layout Decisions in Manufacturing and Services67 Questions
Exam 4: Business Processes71 Questions
Exam 5: Managing Quality58 Questions
Exam 6: Managing Capacity60 Questions
Exam 7: S Advanced Waiting Line Theory and Simulation Modeling49 Questions
Exam 8: Supply Management67 Questions
Exam 9: Logistics64 Questions
Exam 10: Forecasting55 Questions
Exam 11: Sales and Operations Planning Aggregate Planning55 Questions
Exam 12: Managing Inventory Throughout the Supply Chain54 Questions
Exam 13: Managing Production Across the Supply Chain56 Questions
Exam 14: S Supply Chain Information Systems39 Questions
Exam 15: Jitlean Production51 Questions
Exam 16: Managing Projects56 Questions
Exam 17: Developing Products and Services60 Questions
Select questions type
Sketch the product-process matrix and discuss the placement of each process choice.
(Essay)
4.9/5
(37)
Define the term service package and describe management's focus for each activity.
(Essay)
4.8/5
(39)
The product process matrix uses a scale of ________ and ________.
(Short Answer)
4.9/5
(33)
Service operations compete and position themselves in the marketplace based on the three dimensions - ________,________,and ________.
(Short Answer)
4.8/5
(37)
These three tables show the floor layout of 5 departments in an office building,the average number of daily trips between each pair of offices,and the distance between each pair of offices.What is the total cost of this layout if there is a $0.50 per foot transportation cost?




(Multiple Choice)
4.8/5
(38)
The shorter the required takt time,the more workstations that will be required to balance a production line.
(True/False)
4.8/5
(28)
Products that use standard components but the final configuration of those components is customer-specific are known as:
(Multiple Choice)
4.9/5
(35)
A manufacturer needs to produce 300 coffee pots per 8 hour day.The discrete tasks required to produce a coffee pot have been identified,timed in seconds,and ordered as indicated in the table.Sketch the precedence diagram and then assign tasks to workstations on the production line to achieve the required level of output.Break ties by assigning the longest task first.Determine the efficiency delay of your line balance.


(Essay)
4.8/5
(41)
Products that use standard components,but the final configuration of those components is customer-specific,are called make-to-order products.
(True/False)
4.7/5
(35)
A collection of different departments must be visited by every new student on campus to take care of registration,housing,books,and other campus services.The placement of these departments within the university center is an example of a(n)________ layout.
(Short Answer)
4.8/5
(29)
A manager deciding where 6 departments could be located in a six room office building has over 500 possible arrangements.
(True/False)
4.8/5
(47)
What are the two types of product-based layouts? What are their similarities and differences and their advantages and disadvantages compared with other types of layouts and processes?
(Essay)
4.9/5
(35)
What are the four levels of customization and at what place does each occur in the supply chain?
(Essay)
4.8/5
(33)
Capability variety is the difference in how customers view an identical service outcome.What some customers might view as economical and thrifty others might view as cheap and poor value.
(True/False)
4.8/5
(48)
A product-based layout arranges resources sequentially according to the steps required to make a product.
(True/False)
4.9/5
(37)
In a service blueprint,the line of internal interaction falls between the customer and the onstage service provider.
(True/False)
4.9/5
(37)
The process design team at a manufacturer has broken an assembly process into eight basic steps,each with a required time,and predecessor as shown in the table.They work a 7 hour day and want to produce at a rate of 360 units per day.What should their takt time be? 

(Multiple Choice)
4.7/5
(36)
As the degree of customer contact decreases,more of the service package is provided by the ________.
(Short Answer)
4.9/5
(35)
Showing 41 - 60 of 67
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)