Exam 10: Quality Management and Six-Sigma Supply Chain Processes and Analytics
Exam 1: Operations and Supply Chain Management71 Questions
Exam 2: Strategy and Sustainability48 Questions
Exam 3: Forecasting90 Questions
Exam 4: Strategic Capacity Management55 Questions
Exam 4: PART-A: Learning Curves49 Questions
Exam 5: Projects Manufacturing and Service Processes72 Questions
Exam 6: Manufacturing Processes56 Questions
Exam 6: PART-A: Break-Even Analysis9 Questions
Exam 7: Service Processes76 Questions
Exam 8: Sales and Operations Planning58 Questions
Exam 9: Material Requirements Planning81 Questions
Exam 10: Quality Management and Six-Sigma Supply Chain Processes and Analytics129 Questions
Exam 11: Inventory Management100 Questions
Exam 12: Lean Supply Chains71 Questions
Exam 13: Global Sourcing and Procurement64 Questions
Exam 14: Location, Logistics and Distribution54 Questions
Select questions type
The Malcolm Baldrige award selection process helps improve quality and productivity by which of the following means?
(Multiple Choice)
4.7/5
(38)
Which of the following should we use an "R" chart to monitor process quality?
(Multiple Choice)
4.9/5
(43)
You want to determine the lower control line for a "p" chart for quality control purposes.You take several samples of a size of 50 items in your production process.From the samples you determine the fraction defective is 0.006 and the standard deviation is 0.001.If the desired confidence level is 99.7 percent,which of the following is the resulting LCL value for the line?
(Multiple Choice)
4.7/5
(34)
The Malcolm Baldrige National Quality Award represents the U.S.government's endorsement of quality as an essential part of successful business strategy.
(True/False)
4.9/5
(47)
The term "conformance quality" refers to the relative level of performance of a product as compared to competing products.For instance,certain luxury sedans are said to be of "higher quality" than some low-priced subcompact automobiles.
(True/False)
4.8/5
(41)
The term CTQ stands for "Cost Through Quality",which is another way to express Philip Crosby's idea that "Quality is Free."
(True/False)
4.9/5
(36)
An opportunity flow diagram is a time sequenced chart showing plotted values measuring the flow of end product or components.
(True/False)
4.8/5
(32)
An example of assignable variation in a production system may be that a machine is not adjusted properly.
(True/False)
4.9/5
(38)
You want to develop a three-sigma "R" chart.You know the average range is 12 based on several samples of size 6.Which of the following is the resulting LCL?
(Multiple Choice)
4.8/5
(40)
fishbone diagram as part of a six-sigma quality improvement process might be found in which DMAIC category?
(Multiple Choice)
4.9/5
(40)
To obtain a 99.7 percent confidence level in a "p" chart we would use a value of 3 for "z".
(True/False)
4.8/5
(31)
An operational goal of total quality management is the careful design of the product or service.
(True/False)
4.7/5
(31)
Total,one-hundred-percent,inspection can never be cost justified.
(True/False)
4.9/5
(34)
W.Edwards Deming states that the correct cost for a well-run quality management program should be under 0.5 percent of sales.
(True/False)
4.7/5
(35)
The probability associated with accepting a low quality lot is denoted in acceptance sampling with the Greek letter alpha.
(True/False)
4.8/5
(44)
It is impossible to have zero variability in production processes.
(True/False)
4.9/5
(36)
An opportunity flow diagram as part of a six-sigma quality improvement process might be found in which DMAIC category?
(Multiple Choice)
4.8/5
(31)
quality guru named Joseph M.Juran is well known for his program structured around "14 points" for management.
(True/False)
4.8/5
(43)
Which of the following are eligible companies to be considered for the Baldrige award?