Exam 7: Work Design and Measurement
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
Predetermined time standards are usually based on observing one very efficient worker performing the task.
(True/False)
4.8/5
(50)
One form of long term team that is increasingly being used, especially in lean production settings, is:
(Multiple Choice)
4.9/5
(34)
A work sampling study of kitchen help is to be designed.The study will be conducted over a nine-day period.The kitchen help works a seven-hour shift.Determine the day, hour, and minute of five observations using the random digits listed below.
(Essay)
4.8/5
(35)
"Knowledge-based pay systems" pay higher wages or salaries to workers who have completed college than to those who just finished high school.
(True/False)
4.9/5
(36)
For a confidence level of 86.64%, what is the maximum error of the estimate for activity B?
(Short Answer)
4.8/5
(37)
The design of work systems, because objective standards are used, avoids most ethical issues.
(True/False)
4.8/5
(39)
What is the standard time (ST) for this task if the employee worked at a 20% faster pace than is average and an allowance of 25% of job time is used?
(Multiple Choice)
4.8/5
(35)
Methods analysis cannot be done for new jobs (ones that do not yet exist) since it requires observation of the process.
(True/False)
4.8/5
(38)
One potential disadvantage of "self-directed teams" is higher training costs.
(True/False)
4.8/5
(42)
What is the standard time (ST) for this task if the bartender worked at a twenty percent faster pace than is average, and an allowance of twenty percent of the workday is used?
(Multiple Choice)
4.8/5
(51)
What is the normal time (NT) for this task if the employee worked at a 20% faster pace than is average?
(Multiple Choice)
4.8/5
(33)
Which sample proportion will require the largest number of work sampling observations?
(Multiple Choice)
4.8/5
(44)
Which of the following most closely describes job enlargement?
(Multiple Choice)
4.9/5
(38)
The Occupational Safety and Health Act (OSHA) is a regulatory burden that has been proven to have little impact on the safety and welfare of workers.
(True/False)
4.9/5
(39)
A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:
(Multiple Choice)
4.8/5
(38)
Predetermined time standards use historical data from a company's own files.
(True/False)
5.0/5
(27)
How confident can the manager be that the true proportion of time spent mowing is between .45 and .55?
(Multiple Choice)
4.8/5
(32)
A major advantage of job specialization in business is increased _________.
(Multiple Choice)
4.7/5
(34)
What number of observations would be required in a time study in order to obtain a 95 percent confidence that the average time observed was no more than 0.6 minutes from the true mean, assuming a standard deviation of cycle time of 1.8 minutes?
(Essay)
5.0/5
(42)
How many observations should be made if she wants to be 0.8664 confident that the maximum error in the observed time is 0.5 second? Assume that the standard deviation of the task time is 4 seconds.
(Multiple Choice)
4.9/5
(37)
Showing 81 - 100 of 151
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)