Management compensation should be based primarily on organizational output.

(True/False)
4.8/5
(42)

Job enrichment involves giving a workers a greater share of the total task which is why they feel enriched.

(True/False)
4.8/5
(39)

What is the normal time (NT) for this task if the employee worked at a fifty-percent faster pace than is average?

(Multiple Choice)
4.7/5
(38)

When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?

(Multiple Choice)
4.8/5
(34)

What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?

(Multiple Choice)
4.9/5
(33)

For a confidence level of 95.44% and a maximum error of .04, what should be the sample size for estimating the proportion of time spent performing activity C?

(Short Answer)
5.0/5
(41)

What is the observed time (OT) for this task?

(Multiple Choice)
4.9/5
(36)

If the person observed worked at a pace that is 80 percent of normal, and if the appropriate allowance for this task is 25 percent of job time, what should be the standard time?

(Short Answer)
4.7/5
(40)

Studies on worker efficiency and time of day suggest the greatest efficiency is at the end of the day when workers are 'warmed up'.

(True/False)
4.8/5
(38)

"Self-directed teams" are allowed to make changes in the work processes under their control.

(True/False)
4.8/5
(44)

How many observations would be needed to be 95.44% confident that the maximum error in the observed time is 1 second? Assume that the standard deviation of the task time is 2 seconds.

(Short Answer)
4.9/5
(32)

Determining the number of cycles to observe is an element of ________.

(Multiple Choice)
4.9/5
(34)

Therbligs are basic elemental motions.

(True/False)
4.8/5
(39)

A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time.Normal time for the job in minutes is:

(Multiple Choice)
4.8/5
(30)

The chart used to review the overall sequence of an operation by focusing on either the movements of the operator or materials is called a _________.

(Multiple Choice)
4.9/5
(31)

What is the estimated proportion of time this worker spends performing activity B?

(Short Answer)
4.9/5
(34)

A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.

(True/False)
4.9/5
(39)

Between what limits can the manager be 68.26 percent confident the true proportion of time spent mowing is?

(Multiple Choice)
4.9/5
(42)

One of the potential benefits of "self-directed teams" is higher quality.

(True/False)
4.9/5
(33)

What is the standard time (ST) for this task if the employee worked at a fifty-percent faster pace than is average, and an allowance of twenty percent of job time is used?

(Multiple Choice)
4.8/5
(36)