Exam 21: Statistical Process Control
Exam 1: What Is Statistics46 Questions
Exam 2: Graphical Descriptive Techniques 194 Questions
Exam 3: Graphical Descriptive Techniques 2156 Questions
Exam 4: Numerical Descriptive Techniques275 Questions
Exam 5: Data Collection and Sampling84 Questions
Exam 6: Probability240 Questions
Exam 7: Random Variables and Discrete Probability Distributions283 Questions
Exam 8: Continuous Probability Distributions224 Questions
Exam 9: Sampling Distributions156 Questions
Exam 10: Introduction to Estimation154 Questions
Exam 11: Introduction to Hypothesis Testing189 Questions
Exam 12: Inference About a Population153 Questions
Exam 13: Inference About Comparing Two Populations170 Questions
Exam 14: Analysis of Variance157 Questions
Exam 15: Chi-Squared Tests179 Questions
Exam 16: Simple Linear Regression and Correlation304 Questions
Exam 17: Multiple Regression160 Questions
Exam 18: Model Building148 Questions
Exam 19: Nonparametric Statistics175 Questions
Exam 20: Time-Series Analytics and Forecasting225 Questions
Exam 21: Statistical Process Control140 Questions
Exam 22: Decision Analysis123 Questions
Exam 23: Conclusion47 Questions
Select questions type
A malfunctioning valve in a filling machine can create assignable variation.
(True/False)
4.9/5
(34)
A process capability index Cp of 1.0 describes a production where the difference in the specification limits is equal to 6 standard errors.
(True/False)
4.8/5
(30)
We construct a p chart to track the ____________________ of defective units in a series of samples.
(Short Answer)
4.9/5
(38)
Statistical process control allows us to detect ____________________ variation only.
(Short Answer)
4.9/5
(29)
In statistical process control,a Type II error occurs if we conclude that the process is in control when it actually isn't.
(True/False)
4.8/5
(38)
Control limits for the p chart are typically placed so that they are 3 standard errors above and below the centerline.
(True/False)
4.8/5
(36)
A control chart used to monitor a process whose results are categorized as either defective or nondefective is called a(n)____________________.
(Short Answer)
4.8/5
(33)
A production facility produces 75 units per hour and uses an
chart to monitor its quality.The control limits are seat at 2.5 standard errors from the mean.On average,how many units will be produced until the control chart signals that the process is out of control,when it is in fact under control?

(Essay)
4.9/5
(37)
40 Samples Production
The mean of the sample means and the pooled standard deviation of 40 samples of size 8 taken from a production process under control are
,and S = 14.5,respectively.
-{40 Samples Production Narrative} Compute the zone boundaries for the
chart.


(Essay)
4.9/5
(36)
The
chart helps with questions about whether the process is producing the correct or acceptable mean.

(True/False)
4.9/5
(41)
Which of the following elements affects the chance of making a Type II error?
(Multiple Choice)
4.8/5
(31)
An
chart for a normally distributed random variable has control limits set at ±3 standard errors from the centerline.One sample mean falls outside the control limits when the process is actually under control.The probability that this happened by chance is:

(Multiple Choice)
4.8/5
(38)
Assume that the control limits of an
chart are defined as 2 standard errors above and below the centerline.Calculate the probability that a sample mean falls outside the control limits when the process is in fact under control.

(Essay)
4.9/5
(35)
Chance variation ____________________ product quality and ____________________ costs.
(Short Answer)
4.8/5
(37)
What is the average run length (ARL)until an
control chart signals a false alarm if the control limits are set at ±3 standard errors from the centerline?

(Essay)
4.9/5
(37)
Assignable variation is caused by specific events or factors that are frequently temporary.
(True/False)
4.9/5
(33)
25 Samples Production
25 samples of size 4 were taken from a manufacturing process.The mean of the sample means and the pooled standard deviation are
,and S = 3.5,respectively.The sample means are listed below.
-{25 Samples Production Narrative} Plot the sample means on the
chart.



(Essay)
4.8/5
(41)
A trend indicates there is a slow and steady shift in the ____________________ of a process distribution.
(Short Answer)
4.9/5
(32)
To determine whether the process distribution standard deviation has changed,we use a(n):
(Multiple Choice)
4.9/5
(40)
Control charts for variables are appropriate whenever we are interested in monitoring measurements,such as weights,diameters,or temperature.
(True/False)
4.8/5
(36)
Showing 21 - 40 of 140