A project task is said to be __________ if it requires a fixed amount of time and known quantities of resources.

(Multiple Choice)
4.9/5
(38)

The __________ heuristic provides a general solution for critical path and time and is usually the default rule for a schedule.

(Multiple Choice)
4.9/5
(31)

If a predecessor activity finishes early,will the following activity start early? Why?

(Essay)
4.7/5
(34)

The __________ technique overlaps the design and builds phases of a project to expedite its completion.

(Multiple Choice)
4.9/5
(36)

If a contradiction or conflict between constraints is detected,__________ should always take precedence.

(Multiple Choice)
4.8/5
(38)

Discuss the advantages obtained from resource leveling.

(Essay)
5.0/5
(31)

Given W = D * U for an effort-driven task.Assume an 8-hour workday.Initially,task R was assigned to Bob.Bob was expected to accomplish 32 hours of work in five days.Bob was expected to be 100% available to work on task R during the entire five days.However,Bob left the company and will be replaced by Sam.Sam's efficiency rate is 90%.If Sam is only 70% available,Sam will require __________ hours to complete task R.

(Multiple Choice)
4.8/5
(34)

Discuss some other causes of the strong optimistic bias in a project schedule.

(Essay)
4.7/5
(36)

In some situations,two activities are scheduled to be carried out in parallel and using the same scarce resource.If the supply of the scarce resource is not sufficient to allow both activities to be carried out simultaneously,then whichever of the two is given priority immediately lengthens the other activity's path but not its actual __________.

(Multiple Choice)
4.8/5
(35)

The use of __________ activity time estimates may reduce the chance that crashing the project will be needed.

(Multiple Choice)
4.8/5
(30)

The standard practice with AOA and AON is to estimate activity times under the assumption of resource loadings that are __________.

(Multiple Choice)
4.8/5
(25)

Which of the following effects will be observed in a network if a date-constrained project is scheduled from the ending date constraint using the "as late as possible" heuristic?

(Multiple Choice)
4.9/5
(37)

The two fundamental approaches to constrained allocation problems are __________.

(Multiple Choice)
4.9/5
(23)

If deterministic time estimates are used,and if project deadlines are firm,there is a high likelihood that it will __________.

(Multiple Choice)
4.9/5
(39)

In CPM,__________ are specified.

(Multiple Choice)
4.9/5
(41)

With respect to project scheduling,__________ is the amount of work waiting to be processed because there is a shortage of some resource.

(Multiple Choice)
4.9/5
(33)

The formula for computing the cost / time slope for each activity that can be crashed is __________.

(Multiple Choice)
4.8/5
(33)

Three important parameters used to assess the effectiveness of a scheduling system include schedule slippage,in-process inventory,and __________.

(Multiple Choice)
4.7/5
(40)

Describe the basic procedure for resource leveling.

(Essay)
4.9/5
(34)

One of the problems that Goldratt observed was that if an activity has slack time,the task might become delayed until the slack is removed.This is referred to as __________.

(Multiple Choice)
4.7/5
(27)