Exam 6: Quality and Process Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which one of the following statements about TQM is FALSE?

(Multiple Choice)
4.8/5
(30)

The UCL and LCL for an The UCL and LCL for an   -chart are 25 and 15 respectively.The central line is 20,and the process variability is considered to be in statistical control.The results of the next six sample means are 18,23,17,21,24,and 16.What should you do? -chart are 25 and 15 respectively.The central line is 20,and the process variability is considered to be in statistical control.The results of the next six sample means are 18,23,17,21,24,and 16.What should you do?

(Multiple Choice)
4.7/5
(39)

Six sigma is a comprehensive and flexible system for achieving,sustaining,and maximizing business success by minimizing defects and variability in processes.

(True/False)
4.9/5
(40)

The advantage of variable measurements is that they can be quickly counted compared to attribute measurements.

(True/False)
4.8/5
(28)

Which one of the following statements about quality control is TRUE?

(Multiple Choice)
4.8/5
(28)

The upper and lower specifications for a service are 10 min.and 8 min. ,respectively.The process standard deviation is 0.25 min.and the process average is 9 min.What conclusion can be drawn?

(Multiple Choice)
4.8/5
(33)

________ published a book titled Quality is Free which stressed the principle that the trade-off between tolerating versus preventing poor quality should always favour prevention and improvement.

(Essay)
4.9/5
(32)

Which one of the following is considered to be an appraisal cost?

(Multiple Choice)
4.8/5
(25)

A control chart is a time-ordered diagram that is used to determine whether observed variations are abnormal.

(True/False)
4.8/5
(35)

________ believed that continuous improvement,hands-on management,and training are fundamental to achieving excellence in quality.

(Essay)
4.9/5
(29)

________ argued that 85% of quality problems can be attributed to managers or the systems they put in place.

(Essay)
4.8/5
(37)

________ philosophy was that quality is the responsibility of management.

(Essay)
4.9/5
(40)

The most thorough approach to inspection is to inspect each product or service at each stage of the process for quality;this is called ________.

(Essay)
4.8/5
(37)

"Conformance to specifications" implies that

(Multiple Choice)
5.0/5
(37)

A(n)________ is a diagram that relates a key quality problem to its potential causes.

(Essay)
4.8/5
(35)

________ is an approach to teamwork that moves responsibility for decision farther down the organizational chart--to the level of the employee actually doing the job.

(Essay)
4.8/5
(33)

Common causes of variation are the purely random,unidentifiable sources of variation that are unavoidable with the current process.

(True/False)
4.8/5
(35)

________ means that customers expect the product or services they buy to meet or exceed certain advertised levels of performance.

(Essay)
4.8/5
(27)

Which one of the following statements about total quality management is TRUE?

(Multiple Choice)
4.8/5
(31)

The upper limit and lower specifications for a service are 5.0 min.and 3.0 min. ,respectively.The process standard deviation is 0.4 min.and the process average is 4.0 min.What conclusion can be drawn?

(Multiple Choice)
4.7/5
(37)
Showing 121 - 140 of 197
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)