Exam 6: Quality and Process Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

One of the principles that total quality management (TQM)stresses is employee involvement.

(True/False)
4.9/5
(32)

________ includes basic performance,supplemental features,reliability,durability,support,and psychological impressions.

(Essay)
4.8/5
(29)

A manufacturer of silk inspects each bolt of material at the end of the manufacturing process.When the process is in control,it averages 11 defects per bolt.If a 2-sigma control limit is used,what should be done if a bolt is found with 3 defects?

(Multiple Choice)
5.0/5
(42)

Mean time between failures,failure rate per month,and average percentage of late arrivals are examples of which aspect of high-performance design?

(Multiple Choice)
4.8/5
(28)

Training employees in the methods of continuous improvement would be categorized as an appraisal cost of quality.

(True/False)
4.8/5
(32)

The costs associated with warranty claims would be categorized as an internal failure cost of quality.

(True/False)
4.7/5
(39)

________ of variation include any variation-causing factors that can be identified and eliminated.

(Essay)
4.8/5
(39)

Which of the following statements is NOT one of Deming's 14 points for improving quality?

(Multiple Choice)
5.0/5
(41)

Most experts estimate the cost of poor quality in the range of 20 to 30 percent of gross sales for defective or unsatisfactory products.

(True/False)
4.8/5
(34)

Assignable causes of variation include any variable-causing factors that can be identified and eliminated.

(True/False)
4.9/5
(36)

________ costs arise when a defect is discovered after the customer has received the product or service.

(Essay)
4.8/5
(33)

Which of the following would be a "common" cause of variation?

(Multiple Choice)
4.9/5
(35)

Functional benchmarking is based on comparisons with a direct industry competitor.

(True/False)
4.7/5
(32)

The idea of continuous improvement is that activities not contributing value are wasteful and should be recycled or eliminated.An example of such an activity is

(Multiple Choice)
4.7/5
(28)

A product has three components with individual reliabilities of 0.85,0.92,and 0.95.What is the reliability of the product?

(Multiple Choice)
4.7/5
(32)

A hotel tracks the number of complaints per month.When the process is in control,there is an average of 35 complaints per month.Assume that a 2-sigma control limit is used.What is the lower control limit?

(Multiple Choice)
4.8/5
(33)

Which of the following is NOT a variable measure of quality?

(Multiple Choice)
4.7/5
(27)

The additional time incurred if an item is rerouted to some previous operation(s)to correct a defect would be categorized as an internal failure cost of quality.

(True/False)
4.7/5
(33)

In applying quality control charts,eight consecutive values that fall on the same side of the central line indicates a process that is in statistical control.

(True/False)
4.9/5
(30)

A hotel tracks the number of complaints per month.When the process is in control,there is an average of 35 complaints per month.Assume that a 2-sigma control limit is used.What is the upper control limit?

(Multiple Choice)
4.8/5
(31)
Showing 61 - 80 of 197
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)