Exam 3: Statistical Process Control
Exam 1: Introduction to Operations and Supply Chain Management74 Questions
Exam 2: Quality Management86 Questions
Exam 3: Statistical Process Control161 Questions
Exam 4: Product Design81 Questions
Exam 5: Service Design77 Questions
Exam 6: Processes and Technology48 Questions
Exam 7: Capacity and Facilities Design90 Questions
Exam 8: Human Resources85 Questions
Exam 9: Project Management98 Questions
Exam 10: Supply Chain Management Strategy and Design73 Questions
Exam 11: Global Supply Chain Procurement and Distribution96 Questions
Exam 12: Forecasting99 Questions
Exam 13: Inventory Management25 Questions
Exam 14: Sales and Operations Planning34 Questions
Exam 15: Resource Planning86 Questions
Exam 16: Lean Systems99 Questions
Exam 17: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 18: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 19: Operational Decision-Making Tools: Facility Location Models23 Questions
Exam 20: Operational Decision-Making Tools: Work Measurement29 Questions
Exam 21: Operational Decison-Making Tools: Transportation and Transshipment Models102 Questions
Exam 22: Operational Decision-Making Tools: Simulation84 Questions
Exam 23: Operational Decision-Making Tools: Linear Programming92 Questions
Select questions type
Variable control charts are used to monitor measurable characteristics of a process's outputs rather than descriptive characteristics.
(True/False)
4.9/5
(44)
Pizazz manufactures a 5.0 oz. energy drink of the same name. Because the cans are so small, consumers are concerned that they are not receiving the full 5 ounces in each can. A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings. On 15 different occasions over the past month, she has taken a sample of 6 energy drinks off the production line and recorded their weight. If the sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces, the UCL for an R-chart of this process would be
(Short Answer)
4.9/5
(47)
Tolerances reflect the amount of common cause variation allowed in a process.
(True/False)
4.9/5
(45)
Statistical process control is only effective for service processes.
(True/False)
4.9/5
(36)
When a control chart detects no special cause (nonrandom) variation in a process, the upper and lower control limits are the same value.
(True/False)
4.8/5
(35)
Marble Inc. makes countertops from a variety of high-end materials. To monitor the quality of its production processes the company randomly selects one countertop and counts the number of blemishes. The results for ten samples are shown below: 5.
6.
Given the sample information above, the UCL using sigma = 3 for this process would be

(Multiple Choice)
4.8/5
(37)
A company manufactures a product that has a design (nominal) target width of 5 inches with tolerances of + .05 inch. The process that produces the product has a mean of 4.995 inches and a standard deviation of 0.01 inch. The process capability ratio for this process is
(Multiple Choice)
4.9/5
(39)
For a given process, the process capability ratio is NOT not related to its control specification limits.
(True/False)
4.9/5
(40)
Statistical process control is a tool used to monitor and improve quality.
(True/False)
4.8/5
(33)
After special cause variation is detected, the focus changes to identifying the root cause of the variation and eliminating it.
(True/False)
4.8/5
(31)
When constructing a control chart for the first time, all points should be within the control limits indicating the process is in control.
(True/False)
4.9/5
(33)
Consider a production process that produces batteries. A quality engineer has taken 20 samples each containing 100 batterieslight bulbs. The total number of defective batteriesunits observed over the 20 samples is 1200. The LCL for the control chat constructed using two sigma is
(Multiple Choice)
4.9/5
(38)
Consider a production process that produces tires. A quality engineer has taken 15 samples, each containing 200 tires. The total number of defective tires over the 15 samples is 340. The centerline for the control chart is
(Multiple Choice)
4.9/5
(36)
The process centerline for both xbar and R charts are both the same value because they are based on the same raw data.
(True/False)
4.7/5
(33)
The formulas for determining the upper and lower control limits are based on the number of standard deviations, z, from the process average. Management usually selects a z value of _______because it wants a high probability that these sample values will fall within the control limits.
(Multiple Choice)
4.8/5
(39)
Which of the following could be responsible for variability that is special cause (nonrandom)?
(Multiple Choice)
4.9/5
(41)
Process control charts are often used at a critical point after which it is difficult to correct or rework the process output.
(True/False)
4.9/5
(41)
Only certified statisticians should use Excel to construct a control chart for a process.
(True/False)
4.9/5
(38)
Showing 141 - 160 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)