Exam 23: Linear Programming
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
What are corner points? What is their relevance to solving linear programming problems?
(Essay)
4.8/5
(34)
A linear programming problem contains a restriction that reads "the quantity of S must be no less than one-fourth as large as T and U combined." Formulate this as a linear programming constraint.
(Multiple Choice)
4.9/5
(38)
Suppose that an iso-profit line is given to be X + Y = 10.Which of the following represents another iso-profit line for the same scenario?
(Multiple Choice)
4.7/5
(33)
Which of the following is not a requirement of a linear programming problem?
(Multiple Choice)
4.8/5
(39)
Sensitivity analysis can be applied to linear programming solutions by either (1)trial and error or (2)the analytic postoptimality method.
(True/False)
4.9/5
(34)
________ are restrictions that limit the degree to which a manager can pursue an objective.
(Short Answer)
4.9/5
(36)
The requirements of linear programming problems include an objective function,the presence of constraints,objective and constraints expressed in linear equalities or inequalities,and ________.
(Short Answer)
4.9/5
(35)
In the graphical solution to a linear program,the region that satisfies the constraint 4X + 15Z ≥ 1000 includes the origin of the graph.
(True/False)
4.8/5
(36)
A difference between minimization and maximization problems is that:
(Multiple Choice)
4.9/5
(33)
A manager must decide on the mix of products to produce for the coming week.Product A requires three minutes per unit for molding,two minutes per unit for painting,and one minute for packing.Product B requires two minutes per unit for molding,four minutes for painting,and three minutes per unit for packing.There will be 600 minutes available for molding,600 minutes for painting,and 420 minutes for packing.Both products have contributions of $1.50 per unit.Answer the following questions; base your work on the solution panel provided.
a.What combination of A and B will maximize contribution?
b.What is the maximum possible contribution?
c.Are any resources not fully used up? Explain.

(Essay)
4.9/5
(35)
For a linear programming problem with the constraints 2X + 4Y ≤ 100 and 1X + 8Y ≤ 100,two of its corner points are (0,0)and (0,25).
(True/False)
4.7/5
(35)
Consider the following constraints from a two-variable linear program:X ≥ 1;Y ≥ 1;X + Y ≤ 9. If these are the only constraints,which of the following points (X,Y)CANNOT be the optimal solution?
(Multiple Choice)
4.9/5
(31)
A common form of the product-mix linear programming problem seeks to find that combination of products and the quantity of each that maximizes profit in the presence of limited resources.
(True/False)
4.9/5
(25)
A linear programming problem has three constraints,plus nonnegativity constraints on X and Y.The constraints are: 2X + 10Y ≤ 100; 4X + 6Y ≤ 120; 6X + 3Y ≥ 90. What is the largest quantity of X that can be made without violating any of these constraints?
(Multiple Choice)
4.7/5
(35)
Which of the following represents a valid constraint in linear programming?
(Multiple Choice)
4.9/5
(32)
A firm makes two products,Y and Z.Each unit of Y costs $10 and sells for $40.Each unit of Z costs $5 and sells for $25.If the firm's goal were to maximize profit,what would be the appropriate objective function?
(Multiple Choice)
4.8/5
(36)
The feasible region in the diagram below is consistent with which one of the following constraints? 

(Multiple Choice)
4.9/5
(32)
What combination of x and y will yield the optimum for this problem?
Maximize $3x + $15y,subject to
(1)2x + 4y ≤ 12 and
(2)5x + 2y ≤ 10 and
(3)x,y ≥ 0.
(Multiple Choice)
4.7/5
(31)
A linear programming problem contains a restriction that reads "the quantity of X must be at least twice as large as the quantity of Y." Formulate this as a linear programming constraint.