A working MRP system allows a firm to react to even minor changes in production requirements.Discuss both the advantages and disadvantages of having such ability.

Free
(Essay)
5.0/5
(29)
Correct Answer:
Verified

The advantages are it allows the firm to react quickly and,conceivably,to minimize costs.The disadvantages are the reaction to a large number of minor changes may introduce instability (nervousness)into the purchasing and production departments.

________ refers to the time units in a material requirements planning (MRP)system.

Free
(Essay)
4.9/5
(29)
Correct Answer:
Verified

Buckets

A(n)________ is a bill of material for components,usually assemblies that exist only temporarily;they are never inventoried.

Free
(Essay)
4.8/5
(30)
Correct Answer:
Verified

Phantom bill of material

A company is trying to implement MRP but is having trouble determining which order sizing method will minimize costs.Setup cost is $200 and holding cost is $2/period.If each period is 1 week,gross requirements are 270 units per 10 weeks,and there are 6 planned order releases for every 10 weeks,calculate the cost for lot-for-lot compared to EOQ for an entire year.Assume that EOQ and lot-for-lot are computed as though the usage will occur continually throughout the year.

(Essay)
4.7/5
(35)

The ________ technique may be applicable where a firm's parts and subassemblies are common to a variety of its products.

(Essay)
4.9/5
(26)

Bills of material organized by major subassemblies or by product options are called ________.

(Essay)
4.8/5
(35)

Explain the difference between a gross requirements plan and a net requirements plan.

(Essay)
4.9/5
(31)

By convention,the top level in a bill of material is designated level 1.

(True/False)
4.8/5
(43)

Closed-loop MRP systems allow production planners to move work between time periods to smooth the load or to at least bring it within capacity.

(True/False)
4.7/5
(36)

A bill of material lists the

(Multiple Choice)
4.9/5
(35)

The minimum record accuracy required for successful MRP is approximately

(Multiple Choice)
4.8/5
(26)

A process-focus facility (for example,a print shop)will likely schedule ________ as the focus of its master production schedule.

(Essay)
4.8/5
(39)

The Aggregate Plan,derived from the Master Production Schedule,specifies in more detail how much of which products is to be made at what times.

(True/False)
4.8/5
(33)

Describe the tactics for load smoothing in MRP.

(Essay)
4.9/5
(36)

Which of the following statements regarding lot-sizing is true?

(Multiple Choice)
4.7/5
(43)

Four A washers,Five B washers,Two C bolts,and a D bolt are required to make one Grill parts kit.If 100 grill part kits are needed how many more washers will be consumed than bolts?

(Essay)
4.8/5
(32)

You have seen several methods for lot sizing in MRP.Why is lot sizing important in MRP? Can too much concern be given lot sizing? Answer in a well-developed paragraph.

(Essay)
4.8/5
(46)

The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.

(True/False)
4.8/5
(27)

The Wagner-Whitin algorithm is the most widely used MRP lot-sizing technique.

(True/False)
4.7/5
(41)

A grill assembly takes 20 washers.Instead of listing these washers separately they are grouped into a single kit for production.The bill of material for the washers is classified as

(Multiple Choice)
4.9/5
(36)