Exam 3: Project Management
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
Gantt charts give a timeline for each of a project's activities,but they do not adequately illustrate the interrelationships between the activities and the resources.
Free
(True/False)
4.8/5
(34)
Correct Answer:
True
________ is a network technique using only one time factor per activity that enables managers to schedule,monitor,and control large and complex projects.
Free
(Essay)
4.7/5
(41)
Correct Answer:
Critical path method or CPM
Which of the following statements regarding EllisDon is false?
Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
D
Describe in words how to calculate a project's standard deviation.What assumption allows that calculation to be accurate?
(Essay)
4.9/5
(35)
Describe some of the challenges faced in the construction of the new 11-story building at Arnold Palmer Hospital in Orlando,Florida.
(Essay)
4.9/5
(30)
If an activity whose normal duration is 55 days can be shortened to 50 days for an added cost of $45,000,the crash cost per period is
(Multiple Choice)
4.8/5
(22)
Draw the AOA and AON networks for the following project and calculate the minimum project duration.


(Essay)
4.9/5
(32)
An activity on a PERT network has these time estimates: optimistic = 1,most likely = 2,and pessimistic = 5.Its expected time is
(Multiple Choice)
4.8/5
(36)
The project organization works best when which of the following conditions are satisfied?
(Multiple Choice)
4.9/5
(39)
The ________ distribution is used by PERT analysis to calculate expected activity times and variances.
(Multiple Choice)
4.9/5
(41)
The ________ distribution is appropriate for calculating expected activity times and activity variances in PERT networks.
(Essay)
4.9/5
(35)
The critical path can be determined by use of either the "forward pass" or the "backward pass."
(True/False)
4.8/5
(47)
Explain why the critical path is the longest,not the shortest,path through a network.
(Essay)
4.8/5
(39)
What are some of the ethical issues faced by project managers? Which of these are likely to occur before a project begins,which are likely to occur while the project is underway,and which may occur after a project is complete? Illustrate any one of these from recent news.
(Essay)
4.9/5
(35)
Briefly discuss what is meant by critical path analysis.What are critical path activities and why are they important?
(Essay)
5.0/5
(29)
Which of the following statements regarding PERT times is true?
(Multiple Choice)
4.8/5
(30)
The fundamental difference between PERT and CPM is that PERT uses the beta distribution for crashing projects while CPM uses cost estimates.
(True/False)
4.8/5
(43)
Which of the following statements regarding critical paths is true?
(Multiple Choice)
4.9/5
(37)
Showing 1 - 20 of 122
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)