Which of the following is not a goal of JIT partnerships?

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

E

Which of the following is false regarding the links between JIT and quality?

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

E

Which of the following is the author of the phrase "Inventory is evil"?

Free
(Multiple Choice)
4.9/5
(25)
Correct Answer:
Verified

D

Throughput measures the time

(Multiple Choice)
4.8/5
(33)

Factory X is trying to use level use scheduling.If their first target were to cut the current lot size in half,by what proportion must setup cost change?

(Multiple Choice)
4.9/5
(17)

Which of the following is generally found in most JIT environments?

(Multiple Choice)
4.9/5
(30)

Which of the following is not a reason for variability?

(Multiple Choice)
4.9/5
(34)

Manufacturing cycle time is best defined as the

(Multiple Choice)
4.9/5
(32)

TPS stands for Toyota Production System.

(True/False)
5.0/5
(30)

Identify JIT policies for and expectations of suppliers.

(Essay)
4.8/5
(28)

Which one of the following statements is true about the kanban system?

(Multiple Choice)
4.9/5
(29)

A bakery uses 5 containers that hold 3 cakes.Daily demand is 10 cakes and safety stock is 5 cakes.What is the lead time?

(Essay)
4.7/5
(33)

Differentiate between a push and a pull system.

(Essay)
4.8/5
(32)

Kanban is associated with all of the following except

(Multiple Choice)
4.8/5
(43)

Daily usage of a part is 20 in a facility that operates 250 days of the year.Setup cost is $20 and annualized carrying cost is $210.Production of this part occurs at the rate of 50 per day when production of the part is underway.Lead time is 1 day;safety stock is Daily usage of a part is 20 in a facility that operates 250 days of the year.Setup cost is $20 and annualized carrying cost is $210.Production of this part occurs at the rate of 50 per day when production of the part is underway.Lead time is 1 day;safety stock is   day's production.What is the optimum kanban size,and number of kanbans? day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.7/5
(37)

If the goals of JIT partnerships are met,which of the following is a result?

(Multiple Choice)
4.8/5
(28)

Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is   day's production.What is the optimum kanban size,and number of kanbans? day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.8/5
(29)

Daily usage of a product is 10 in a facility that operates every day of the year.Setup cost is $68 and annualized carrying cost is $100.Daily production of this product is 20.Lead time is 14 days;safety stock is one day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.8/5
(26)

The first step in reducing setup times is the separation of setup into preparation activities and actual setup,so that as much work as possible can be done while the machine or process is operating.

(True/False)
4.9/5
(42)

What are the goals of JIT partnerships?

(Essay)
4.7/5
(41)
Showing 1 - 20 of 138