Exam 9: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
Which of the following is a common heuristic for assembly line balancing?
Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
D
Which of the following constitutes a major trend influencing office layouts?
Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
D
You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.
a.Draw the precedence diagram.
b.Determine the desired cycle time.
c.Determine the theoretical minimum number of stations needed.
d.Balance this line using most following tasks.
e.What is the efficiency of the line obtained in part d?

Free
(Essay)
4.9/5
(36)
Correct Answer:
The precedence diagram appears below.The desired cycle time for 80 units is 6 minutes.The theoretical minimum number of stations is 10.1 / 6 = 1.68 or 2.
Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?
(Multiple Choice)
4.8/5
(27)
A facilities manager at a company headquarters once said,"I'd like to use Muther's office relationship chart or the load-distance model to solve our layout problems,but neither tool can optimize.I want the best layout possible." Discuss.
(Essay)
4.7/5
(36)
In assembly line balancing,cycle time (the ratio of available production time to scheduled production)is the
(Multiple Choice)
4.9/5
(42)
One guideline for determining the arrangement and space allocation of a retail store is to place high-impulse and high-margin items such as housewares and beauty aids in prominent locations.
(True/False)
4.9/5
(44)
Balancing low-cost storage with low-cost material handling is important in a(n)
(Multiple Choice)
4.8/5
(37)
A facility is trying to set up an assembly line,and has identified the various tasks,and their relationship to each other,as shown in the following table.They wish to produce 600 units per day,working two 8-hour shifts.
a.Draw a network diagram of precedence relationships.
b.Compute the required cycle time per unit in seconds.
c.Compute the minimum number of workstations required to produce 600 units per day.
d.Balance this line using longest processing time.
e.What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(42)
For which of the following operations would a fixed-position layout be most appropriate?
(Multiple Choice)
4.8/5
(35)
The ________ is a non-numeric method for determining which departments are located near one another,and which departments are kept farther apart.
(Essay)
4.8/5
(37)
A manufacturing work cell has a takt time of 7 minutes and is staffed by 10 workers.If the work cell delivers 68 units each day find
A.The total operation time
B.The amount of time worked during the day for all 10 workers combined
C.If the plant is open for only 8 hours per day,can the staff meet demand?
(Essay)
4.9/5
(35)
Explain how a load-distance model helps solve problems in process layout.
(Essay)
4.7/5
(36)
________ layouts deal with low-volume,high-variety production with like machines and equipment grouped together.
(Essay)
4.8/5
(38)
A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the longest possible assigned task time is ________ and the shortest possible assigned task time is ________ minutes.
(Multiple Choice)
4.8/5
(41)
What are the two basic types of product layouts? Explain how they are alike,and how they are different.
(Essay)
4.8/5
(34)
Which of the statements below best describes office layout?