Exam 9: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is a common heuristic for assembly line balancing?

Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
Verified

D

Which of the following constitutes a major trend influencing office layouts?

Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
Verified

D

You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below. You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.    a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using most following tasks. e.What is the efficiency of the line obtained in part d? a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using most following tasks. e.What is the efficiency of the line obtained in part d?

Free
(Essay)
4.9/5
(36)
Correct Answer:
Verified

The precedence diagram appears below.The desired cycle time for 80 units is 6 minutes.The theoretical minimum number of stations is 10.1 / 6 = 1.68 or 2. The precedence diagram appears below.The desired cycle time for 80 units is 6 minutes.The theoretical minimum number of stations is 10.1 / 6 = 1.68 or 2.    The precedence diagram appears below.The desired cycle time for 80 units is 6 minutes.The theoretical minimum number of stations is 10.1 / 6 = 1.68 or 2.

Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?

(Multiple Choice)
4.8/5
(27)

Slotting fees

(Multiple Choice)
4.8/5
(30)

The objective of layout strategy is to

(Multiple Choice)
4.8/5
(37)

CRAFT is software for balancing assembly lines.

(True/False)
4.8/5
(26)

A facilities manager at a company headquarters once said,"I'd like to use Muther's office relationship chart or the load-distance model to solve our layout problems,but neither tool can optimize.I want the best layout possible." Discuss.

(Essay)
4.7/5
(36)

In assembly line balancing,cycle time (the ratio of available production time to scheduled production)is the

(Multiple Choice)
4.9/5
(42)

One guideline for determining the arrangement and space allocation of a retail store is to place high-impulse and high-margin items such as housewares and beauty aids in prominent locations.

(True/False)
4.9/5
(44)

Balancing low-cost storage with low-cost material handling is important in a(n)

(Multiple Choice)
4.8/5
(37)

A facility is trying to set up an assembly line,and has identified the various tasks,and their relationship to each other,as shown in the following table.They wish to produce 600 units per day,working two 8-hour shifts. A facility is trying to set up an assembly line,and has identified the various tasks,and their relationship to each other,as shown in the following table.They wish to produce 600 units per day,working two 8-hour shifts.    a.Draw a network diagram of precedence relationships. b.Compute the required cycle time per unit in seconds. c.Compute the minimum number of workstations required to produce 600 units per day. d.Balance this line using longest processing time. e.What is the efficiency of the line obtained in part d? a.Draw a network diagram of precedence relationships. b.Compute the required cycle time per unit in seconds. c.Compute the minimum number of workstations required to produce 600 units per day. d.Balance this line using longest processing time. e.What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(42)

For which of the following operations would a fixed-position layout be most appropriate?

(Multiple Choice)
4.8/5
(35)

The ________ is a non-numeric method for determining which departments are located near one another,and which departments are kept farther apart.

(Essay)
4.8/5
(37)

A manufacturing work cell has a takt time of 7 minutes and is staffed by 10 workers.If the work cell delivers 68 units each day find A.The total operation time B.The amount of time worked during the day for all 10 workers combined C.If the plant is open for only 8 hours per day,can the staff meet demand?

(Essay)
4.9/5
(35)

Explain how a load-distance model helps solve problems in process layout.

(Essay)
4.7/5
(36)

________ layouts deal with low-volume,high-variety production with like machines and equipment grouped together.

(Essay)
4.8/5
(38)

A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the longest possible assigned task time is ________ and the shortest possible assigned task time is ________ minutes.

(Multiple Choice)
4.8/5
(41)

What are the two basic types of product layouts? Explain how they are alike,and how they are different.

(Essay)
4.8/5
(34)

Which of the statements below best describes office layout?

(Multiple Choice)
4.8/5
(36)
Showing 1 - 20 of 161