With level schedules, a few large batches, rather than frequent small batches, are processed.

(True/False)
4.7/5
(34)

________ involves scheduling products so that each day's production meets the demand for that day.

(Short Answer)
4.9/5
(39)

Which of the following is not characteristic of a TPS employee?

(Multiple Choice)
4.7/5
(43)

A bakery uses 6 containers that hold 4 cakes. Daily demand is 10 cakes and safety stock is 8 cakes. What is the lead time?

(Short Answer)
4.8/5
(32)

A bakery uses 7 containers that each hold 6 cakes. If daily demand is 26 cakes and lead time is 1 day determine the safety stock.

(Essay)
4.8/5
(36)

Which of the following is specifically characterized by continuous and forced problem solving through a focus on throughput and reduced inventory?

(Multiple Choice)
4.8/5
(35)

Which of the following is not a concern of suppliers as they prepare to enter into JIT partnerships?

(Multiple Choice)
4.9/5
(35)

A bakery uses 5 containers that each hold 5 cakes. If daily demand is 20 cakes and lead time is 1 day determine the safety stock.

(Essay)
4.7/5
(39)

What are the goals of JIT partnerships?

(Essay)
4.8/5
(33)

Which of the following is true regarding the steps to reducing setup times?

(Multiple Choice)
4.9/5
(38)

Compare and contrast throughput with manufacturing cycle time.

(Essay)
4.8/5
(31)

________ is the minimum inventory necessary to keep a perfect system running.

(Short Answer)
4.8/5
(41)

Identify the layout tactics appropriate for a JIT environment.

(Essay)
4.8/5
(37)

Reduction of in-transit inventory can be encouraged through use of

(Multiple Choice)
4.9/5
(29)

Identify some of the signals that kanban systems use.

(Essay)
4.7/5
(41)

A manufacturer took the following actions to reduce inventory. Which of these is generally not accepted as a JIT action?

(Multiple Choice)
4.9/5
(40)

Factory X is trying to use level use scheduling. If their first target were to cut the current lot size in half, by what proportion must setup cost change?

(Multiple Choice)
4.8/5
(28)

Describe level schedules. What purpose do they serve?

(Essay)
4.8/5
(41)

A push system means providing the next station with exactly what is needed when it is needed.

(True/False)
4.8/5
(45)

Identify JIT policies for and expectations of suppliers.

(Essay)
4.9/5
(36)