Exam 16: Lean Operations
Exam 1: Operations and Productivity134 Questions
Exam 2: Operations Strategy in a Global Environment145 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting151 Questions
Exam 5: Design of Goods and Services136 Questions
Exam 6: Managing Quality139 Questions
Exam 7: Process Strategy and Sustainability141 Questions
Exam 8: Location Strategies149 Questions
Exam 9: Layout Strategies171 Questions
Exam 10: Human Resources, Job Design, and Work Measurement202 Questions
Exam 11: Supply-Chain Management152 Questions
Exam 12: Inventory Management178 Questions
Exam 13: Aggregate Planning144 Questions
Exam 14: Material Requirements Planning Mrp and Erp184 Questions
Exam 15: Short-Term Scheduling149 Questions
Exam 16: Lean Operations147 Questions
Exam 17: Maintenance and Reliability139 Questions
Exam 18: Decision-Making Tools107 Questions
Exam 19: Linear Programming110 Questions
Exam 20: Transportation Models104 Questions
Exam 21: Waiting-Line Models145 Questions
Exam 22: Learning Curves121 Questions
Exam 23: Simulation102 Questions
Exam 24: Supply Chain Management Analytics65 Questions
Exam 25: Sustainability in the Supply Chain11 Questions
Exam 26: Statistical Process Control166 Questions
Exam 27: Capacity and Constraint Management117 Questions
Select questions type
With level schedules, a few large batches, rather than frequent small batches, are processed.
(True/False)
4.7/5
(34)
________ involves scheduling products so that each day's production meets the demand for that day.
(Short Answer)
4.9/5
(39)
Which of the following is not characteristic of a TPS employee?
(Multiple Choice)
4.7/5
(43)
A bakery uses 6 containers that hold 4 cakes. Daily demand is 10 cakes and safety stock is 8 cakes. What is the lead time?
(Short Answer)
4.8/5
(32)
A bakery uses 7 containers that each hold 6 cakes. If daily demand is 26 cakes and lead time is 1 day determine the safety stock.
(Essay)
4.8/5
(36)
Which of the following is specifically characterized by continuous and forced problem solving through a focus on throughput and reduced inventory?
(Multiple Choice)
4.8/5
(35)
Which of the following is not a concern of suppliers as they prepare to enter into JIT partnerships?
(Multiple Choice)
4.9/5
(35)
A bakery uses 5 containers that each hold 5 cakes. If daily demand is 20 cakes and lead time is 1 day determine the safety stock.
(Essay)
4.7/5
(39)
Which of the following is true regarding the steps to reducing setup times?
(Multiple Choice)
4.9/5
(38)
________ is the minimum inventory necessary to keep a perfect system running.
(Short Answer)
4.8/5
(41)
Reduction of in-transit inventory can be encouraged through use of
(Multiple Choice)
4.9/5
(29)
A manufacturer took the following actions to reduce inventory. Which of these is generally not accepted as a JIT action?
(Multiple Choice)
4.9/5
(40)
Factory X is trying to use level use scheduling. If their first target were to cut the current lot size in half, by what proportion must setup cost change?
(Multiple Choice)
4.8/5
(28)
A push system means providing the next station with exactly what is needed when it is needed.
(True/False)
4.8/5
(45)
Showing 101 - 120 of 147
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)