Exam 20: Resource Planning
Exam 1: Operations Management58 Questions
Exam 2: Quality Management74 Questions
Exam 3: Statistical Process Control112 Questions
Exam 4: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 5: Product Design83 Questions
Exam 6: Service Design80 Questions
Exam 7: Processes and Technology73 Questions
Exam 8: Capacity and Facilities Design85 Questions
Exam 9: Operational Decision-Making Tools: Facility Location Models21 Questions
Exam 10: Human Resources79 Questions
Exam 11: Operational Decision-Making Tools: Work Measurement31 Questions
Exam 12: Project Management85 Questions
Exam 13: Supply Chain Management: Strategy and Design56 Questions
Exam 14: Global Supply Chain Procurement and Distribution69 Questions
Exam 15: Forecasting85 Questions
Exam 16: Inventory Management78 Questions
Exam 17: Operational Decision-Making Tools: Simulation15 Questions
Exam 18: The Sales and Operations Planning Process76 Questions
Exam 19: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 20: Resource Planning82 Questions
Exam 21: Lean Systems78 Questions
Exam 22: Scheduling78 Questions
Select questions type
A phantom bill of material is appropriate when a product consists of assemblies that are later combined to form a variety of final products.
(True/False)
4.9/5
(35)
Given the following Product Structure Record:
The number of G's required for each A would be

(Multiple Choice)
4.8/5
(36)
What is the master production schedule (MPS)and what role does in play in the material requirements planning (MRP)process?
(Essay)
4.7/5
(45)
Given the following MRP matrix for Item D:
The projected on hand quantity at the end of period 3 would be

(Multiple Choice)
4.8/5
(30)
Given the following Product Structure Record:
The number of F's required for each A would be

(Multiple Choice)
4.9/5
(33)
The periodic order quantity (POQ)lot-sizing technique places orders every demand period.
(True/False)
4.8/5
(39)
Given the following MRP matrix for Item E:
The projected on hand quantity at the end of period 3 would be

(Multiple Choice)
4.8/5
(37)
Given the following Product Structure Record:
The number of D's required for each A would be

(Multiple Choice)
4.8/5
(26)
Firms that successfully implement an MRP system no longer require cycle counting of inventory.
(True/False)
4.8/5
(33)
Capacity requirement planning (CRP)converts the material plan into labour and machine workloads.
(True/False)
4.9/5
(42)
A material requirements planning (MRP)system serves as both an inventory control system and as a production scheduling system.
(True/False)
4.9/5
(37)
A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period.
If the periodic order quantity lot sizing rule is used,the number of periods worth of requirements would be

(Multiple Choice)
4.8/5
(40)
Given the following MRP matrix for Item E:
The planned order releases for period 1 would be

(Multiple Choice)
4.9/5
(36)
Which of the following is not a major input into capacity requirements planning (CRP)?
(Multiple Choice)
4.9/5
(37)
Lot sizing rules are used in MRP to determine work or purchase order quantities.
(True/False)
4.8/5
(34)
Material requirements planning (MRP)is useful for managing and scheduling discrete demand items.
(True/False)
4.9/5
(36)
A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period.
If EOQ lot sizing is used the minimum order quantity would be

(Multiple Choice)
4.8/5
(36)
Showing 61 - 80 of 82
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)