Exam 20: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A phantom bill of material is appropriate when a product consists of assemblies that are later combined to form a variety of final products.

(True/False)
4.9/5
(35)

Given the following Product Structure Record: Given the following Product Structure Record:   The number of G's required for each A would be The number of G's required for each A would be

(Multiple Choice)
4.8/5
(36)

What is the master production schedule (MPS)and what role does in play in the material requirements planning (MRP)process?

(Essay)
4.7/5
(45)

Given the following MRP matrix for Item D: Given the following MRP matrix for Item D:   The projected on hand quantity at the end of period 3 would be The projected on hand quantity at the end of period 3 would be

(Multiple Choice)
4.8/5
(30)

Given the following Product Structure Record: Given the following Product Structure Record:   The number of F's required for each A would be The number of F's required for each A would be

(Multiple Choice)
4.9/5
(33)

How does MRP differ from traditional inventory control systems?

(Essay)
4.9/5
(50)

The periodic order quantity (POQ)lot-sizing technique places orders every demand period.

(True/False)
4.8/5
(39)

Given the following MRP matrix for Item E: Given the following MRP matrix for Item E:   The projected on hand quantity at the end of period 3 would be The projected on hand quantity at the end of period 3 would be

(Multiple Choice)
4.8/5
(37)

Given the following Product Structure Record: Given the following Product Structure Record:   The number of D's required for each A would be The number of D's required for each A would be

(Multiple Choice)
4.8/5
(26)

ERP application modules can be used alone or in combination.

(True/False)
4.8/5
(37)

Firms that successfully implement an MRP system no longer require cycle counting of inventory.

(True/False)
4.8/5
(33)

Capacity requirement planning (CRP)converts the material plan into labour and machine workloads.

(True/False)
4.9/5
(42)

A material requirements planning (MRP)system serves as both an inventory control system and as a production scheduling system.

(True/False)
4.9/5
(37)

A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period. A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period.   If the periodic order quantity lot sizing rule is used,the number of periods worth of requirements would be If the periodic order quantity lot sizing rule is used,the number of periods worth of requirements would be

(Multiple Choice)
4.8/5
(40)

Given the following MRP matrix for Item E: Given the following MRP matrix for Item E:   The planned order releases for period 1 would be The planned order releases for period 1 would be

(Multiple Choice)
4.9/5
(36)

Which of the following is not a major input into capacity requirements planning (CRP)?

(Multiple Choice)
4.9/5
(37)

Lot sizing rules are used in MRP to determine work or purchase order quantities.

(True/False)
4.8/5
(34)

Material requirements planning (MRP)is useful for managing and scheduling discrete demand items.

(True/False)
4.9/5
(36)

A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period. A firm has the following gross requirements for Item F.If ordering costs are $60 per order and carrying costs are $0.50 per period.   If EOQ lot sizing is used the minimum order quantity would be If EOQ lot sizing is used the minimum order quantity would be

(Multiple Choice)
4.8/5
(36)

What is Enterprise Resource Planning (ERP)?

(Essay)
4.7/5
(40)