Which of the following is not a general characteristic of a project?

(Multiple Choice)
4.9/5
(34)

The critical path is the shortest path through the project's network.

(True/False)
5.0/5
(36)

For an activity-on-node (AON)network

(Multiple Choice)
4.8/5
(36)

A unique,one-time operational activity or effort is referred to as a process.

(True/False)
4.7/5
(38)

Using Table 9.1,the critical path for this project consists of activities

(Multiple Choice)
4.8/5
(34)

Using Table 9.2,the probability that the project could be completed in 34 weeks or less is approximately

(Multiple Choice)
4.8/5
(27)

The project management process encompasses

(Multiple Choice)
4.8/5
(35)

Enterprise project management refers to the management and control of a large,complex project.

(True/False)
4.9/5
(37)

Which of the following is the universal business language most often utilized managing global projects?

(Multiple Choice)
4.8/5
(33)

The longest path through a project network is referred to as the

(Multiple Choice)
5.0/5
(43)

Which of the following is not used to calculate probabilistic time estimates?

(Multiple Choice)
4.9/5
(37)

Asian cultures tend to embrace project management's methodical approach more than western cultures.

(True/False)
4.7/5
(39)

A(n)___ is a project team structure that includes members from different functional areas.

(Multiple Choice)
4.9/5
(39)

The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project. Table 9.2 The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project. Table 9.2   Using Table 9.2,the expected time to complete activity A is Using Table 9.2,the expected time to complete activity A is

(Multiple Choice)
4.9/5
(39)

A standard procedure for numerically measuring a project's progress is referred to as a(n)

(Multiple Choice)
5.0/5
(23)

A bar graph displaying when activities are scheduled to start,when they will be finished,and where extra time is available is known as a

(Multiple Choice)
4.8/5
(42)

Using Table 9.2,the earliest start (ES)time for activity D is

(Multiple Choice)
4.7/5
(33)

PERT stands for program enterprise and resource technique.

(True/False)
4.8/5
(43)

Activities that are not on a project's critical path have zero slack.

(True/False)
5.0/5
(36)

Briefly describe the makeup of the project management team.

(Essay)
4.8/5
(36)