Exam 3: Statistical Process Control
Exam 1: Operations Management58 Questions
Exam 2: Quality Management74 Questions
Exam 3: Statistical Process Control112 Questions
Exam 4: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 5: Product Design83 Questions
Exam 6: Service Design80 Questions
Exam 7: Processes and Technology73 Questions
Exam 8: Capacity and Facilities Design85 Questions
Exam 9: Operational Decision-Making Tools: Facility Location Models21 Questions
Exam 10: Human Resources79 Questions
Exam 11: Operational Decision-Making Tools: Work Measurement31 Questions
Exam 12: Project Management85 Questions
Exam 13: Supply Chain Management: Strategy and Design56 Questions
Exam 14: Global Supply Chain Procurement and Distribution69 Questions
Exam 15: Forecasting85 Questions
Exam 16: Inventory Management78 Questions
Exam 17: Operational Decision-Making Tools: Simulation15 Questions
Exam 18: The Sales and Operations Planning Process76 Questions
Exam 19: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 20: Resource Planning82 Questions
Exam 21: Lean Systems78 Questions
Exam 22: Scheduling78 Questions
Select questions type
Which of the following control charts are often based on sample sizes larger than one hundred?
(Multiple Choice)
4.8/5
(33)
A company manufactures a product that has a design (nominal)target width of 5 inches with tolerances of + .05 inch.The process that produces the product has a mean of 4.995 inches and a standard deviation of 0.01 inch.The process capability index for this process is
(Multiple Choice)
4.8/5
(29)
Design specification limits should always be wider than the control limits for a given process.
(True/False)
5.0/5
(33)
Two types of variation associated with the output of a process are common (random)cause and special cause.
(True/False)
4.8/5
(39)
Using Excel to construct control charts should be avoided because most people believe using software results in too many errors.
(True/False)
4.9/5
(39)
The goal of statistical process control is to ensure that the control limits and specifications limits for a process always remain the same.
(True/False)
4.9/5
(26)
Some companies that strive to provide extremely high quality use Z=6 (six sigma)vs.Z=3 (three sigma)when constructing control limits.
(True/False)
4.7/5
(24)
For a given process,the process capability ratio is not related to its control limits.
(True/False)
4.9/5
(30)
Only certified statisticians should use Excel to construct a control chart for a process.
(True/False)
4.9/5
(41)
If the points plotted on a control chart display a pattern,it is called a run.
(True/False)
4.8/5
(38)
Which of the following control charts is used to control the variation between samples?
(Multiple Choice)
4.9/5
(30)
For the process to be capable of meeting design specification,the process capability index must be
(Multiple Choice)
4.7/5
(29)
Common cause (random)variation provides evidence that the process is not in control.
(True/False)
4.8/5
(31)
A process that is determined to be in control contains no variation.
(True/False)
5.0/5
(40)
An
and R-chart constructed to monitor and control a process use same raw data.

(True/False)
4.8/5
(48)
The individual that detects special cause variation in a process is not allowed to diagnose the root cause and correct it.
(True/False)
4.8/5
(40)
Which of the following is not a characteristic of a control chart?
(Multiple Choice)
4.9/5
(22)
Showing 61 - 80 of 112
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)