Exam 5: Constraint Management
Exam 1: Using Operations to Create Value115 Questions
Exam 2: Process Strategy and Analysis239 Questions
Exam 3: Quality and Performance198 Questions
Exam 4: Capacity Planning120 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems166 Questions
Exam 7: Project Management139 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management205 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning124 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration120 Questions
Exam 15: Supply Chain Sustainability78 Questions
Exam 16: Supplement A Decision Making107 Questions
Exam 17: Supplement J Operations Scheduling123 Questions
Exam 18: Supplement K Layout39 Questions
Exam 19: Supplement B Waiting Lines111 Questions
Exam 20: Supplement C Special Inventory Models53 Questions
Exam 21: Supplement D Linear Programming87 Questions
Exam 22: Supplement E Simulation54 Questions
Exam 23: Supplement F Financial Analysis55 Questions
Exam 24: Supplement G Acceptance Sampling Plans87 Questions
Exam 25: Supplement H Measuring Output Rates108 Questions
Exam 26: Supplement I Learning Curve Analysis50 Questions
Select questions type
Which one of the following statements about line balancing is best?
Free
(Multiple Choice)
5.0/5
(35)
Correct Answer:
D
The production of a particular product consists of the following work elements. If the cycle time is 4 minutes and the work-element times are as follows, what is the theoretical minimum number of stations? 

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
C
The third step in Theory of Constraints application, "subordinate all other decisions to Step 2," means that the analyst should:
Free
(Multiple Choice)
5.0/5
(29)
Correct Answer:
B
How can Theory of Constraints principles be reconciled with line balancing?
(Essay)
4.8/5
(42)
Figure 5.2
The figure above shows the process for customers arriving at Pierre's Spa and Salon. After signing in, customers are routed to different locations in the Spa for the two different services provided. The numbers in parentheses are the time in minutes for each step of the process.
-Use the information in Figure 5.2. What is the throughput time for the A-B-E-F-G-H routing?

(Multiple Choice)
5.0/5
(31)
Table 5.2
A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.2. Using the traditional method, what is the optimal product mix?

(Multiple Choice)
5.0/5
(40)
Table 5.2
A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.2. Using the bottleneck method, what is the optimal product mix?

(Multiple Choice)
4.8/5
(32)
Table 5.2
A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.2. Using the bottleneck method, which product should be scheduled first?

(Multiple Choice)
4.8/5
(39)
Any factor that limits the performance of a system and restricts its output is a(n) ________.
(Short Answer)
4.9/5
(28)
Describe three ways that line balancing and line flow layouts are similar to project management and three ways that they are different from project management.
(Essay)
4.9/5
(37)
Schmidt Industries makes four different snake traps; the Harlan, the Gaylen, the Leah and the Matthew. The Harlan sells for $200 and has $40 in parts and $40 in labor; the Gaylen sells for $150 and requires $30 in parts and $30 in labor; the Leah sells for $100 and has $20 in parts and $20 in labor; and the Matthew sells for $75 but requires only $10 of parts and $10 of labor. Schmidt Industries has four machines (we'll call them A, B, C, and D for convenience) that are used in the production of each of these products. Each of these machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table.
Schmidt Industries has monthly fixed costs of $5,000 and has a demand forecast of 80 Harlans, 60 Gaylens, 40 Leahs and 20 Matthews for the coming month. How many of each of the four models should Susan, the operations manager, schedule for production this month?

(Essay)
4.9/5
(34)
Table 5.4
The Superior Management Company assembles muffalettas in The Big Easy. The steps to making a world class sandwich and the time required (in seconds) for each step are shown in the table.
-Customers demand muffalettas at the rate of 20 sandwiches per hour. Use the information in Table 5.4 to determine the cycle time that will meet this level of demand.

(Multiple Choice)
4.9/5
(32)
The process batch at the constraint in a drum-buffer-rope system should be:
(Multiple Choice)
4.7/5
(38)
Table 5.2
A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.2. Using the bottleneck method, in what sequence should products be scheduled for production?

(Multiple Choice)
4.8/5
(28)
You have been assigned a line balancing task and given a list of tasks, their precedence requirements, and the time needed to accomplish them. As you begin to balance the line, you realize that you must make some assumptions. What are these assumptions and which of them has the greatest impact on the success of your balance?
(Essay)
4.8/5
(42)
Use the process flow diagram to determine which of these events has the greatest net benefit. 

(Multiple Choice)
4.8/5
(31)
Line balancing applies only to line processes that do assembly work, or to work that can be bundled in many ways to create the jobs for each workstation in the line.
(True/False)
4.8/5
(35)
A competent operations manager should first eliminate all of the bottlenecks from the process.
(True/False)
4.9/5
(34)
Line balancing is the assignment of work to stations in a line to achieve the desired output rate with the smallest number of workstations.
(True/False)
4.9/5
(40)
Showing 1 - 20 of 136
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)