Exam 11: Resource Planning
Exam 1: Using Operations to Create Value115 Questions
Exam 2: Process Strategy and Analysis239 Questions
Exam 3: Quality and Performance198 Questions
Exam 4: Capacity Planning120 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems166 Questions
Exam 7: Project Management139 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management205 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning124 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration120 Questions
Exam 15: Supply Chain Sustainability78 Questions
Exam 16: Supplement A Decision Making107 Questions
Exam 17: Supplement J Operations Scheduling123 Questions
Exam 18: Supplement K Layout39 Questions
Exam 19: Supplement B Waiting Lines111 Questions
Exam 20: Supplement C Special Inventory Models53 Questions
Exam 21: Supplement D Linear Programming87 Questions
Exam 22: Supplement E Simulation54 Questions
Exam 23: Supplement F Financial Analysis55 Questions
Exam 24: Supplement G Acceptance Sampling Plans87 Questions
Exam 25: Supplement H Measuring Output Rates108 Questions
Exam 26: Supplement I Learning Curve Analysis50 Questions
Select questions type
Which of the following statements about service resource planning is True?
(Multiple Choice)
4.8/5
(31)
Table 11.1
Big Truck Tacos has developed the following forecast of demand and accepted orders for their holiday tacos as they enter the Taco Festival Season. They enter the planning period with 65 holiday tacos in inventory as shown in Week 0.
-Use Table 11.1 to answer this question. After scoring a terrific deal on tortillas, Big Truck Tacos decides to produce 120 tacos in weeks 1, 2, and 3. If they make tacos in batches of 20, what should their MPS entry be for the fifth week of production?

(Multiple Choice)
4.8/5
(39)
Use the bill of materials and inventory records to determine the quantity of purchased items necessary to assemble 20 end items if the manufacturer uses lot-for-lot ordering. There are no end items currently on hand, and none of the components have any scheduled receipts.



(Essay)
4.9/5
(24)
A materials requirements planning (MRP) explosion occurs when the system is bombarded with too many orders to schedule at one time.
(True/False)
4.9/5
(41)
What information can be gleaned from a bill of materials? If you were asked to produce an item based solely on a copy of its BOM, what missing information would you need?
(Essay)
4.9/5
(38)
A component is an item that may go through one or more operations to be transformed into or become part of one or more parents.
(True/False)
4.8/5
(40)
Which one of the following is an MRP lot-sizing rule that attempts to minimize the amount of average inventory?
(Multiple Choice)
4.9/5
(28)
Use the following partially completed MRP record to answer the question.
What are the quantities of planned order releases for item ABC for the first five weeks (weeks 1, 2, 3, 4, and 5)?

(Multiple Choice)
4.9/5
(38)
Scenario 11.2
Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials.
-Use Scenario 11.2 to answer this question. How many additional units of D are needed to produce seven end items?


(Multiple Choice)
4.8/5
(40)
Material requirements planning (MRP) is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
(True/False)
4.8/5
(36)
Operations produces a number of items in one production period. Those items that are not produced for a specific customer order are ________.
(Short Answer)
4.8/5
(40)
Gross requirements are the total demand derived from all parent production plans.
(True/False)
4.9/5
(38)
MRP ________ is a process that converts the requirements of various final products into a material requirements plan that specifies the replenishment schedule of all the subassemblies, components, and raw materials needed by the final products.
(Short Answer)
4.8/5
(36)
Use the bill of materials and inventory records to determine the additional quantities of purchased items necessary to assemble 15 end items if the manufacturer uses lot-for-lot ordering. There are no end items currently on hand, and none of the components have any scheduled receipts.
Inventory amounts indicated in the table are available to produce the end item indicated in this bill of materials.


(Essay)
4.8/5
(33)
Management wishes to use an FOQ lot-sizing rule for an item based on the economic order quantity. If the annual demand is 1,200 units, the holding cost is $10 per unit per year, and the setup cost is $50 per lot, which one of the following fixed-order quantities is most appropriate?
(Multiple Choice)
4.7/5
(37)
Showing 81 - 100 of 124
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)