Exam 11: Resource Planning
Exam 1: Using Operations to Create Value115 Questions
Exam 2: Process Strategy and Analysis239 Questions
Exam 3: Quality and Performance198 Questions
Exam 4: Capacity Planning120 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems166 Questions
Exam 7: Project Management139 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management205 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning124 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration120 Questions
Exam 15: Supply Chain Sustainability78 Questions
Exam 16: Supplement A Decision Making107 Questions
Exam 17: Supplement J Operations Scheduling123 Questions
Exam 18: Supplement K Layout39 Questions
Exam 19: Supplement B Waiting Lines111 Questions
Exam 20: Supplement C Special Inventory Models53 Questions
Exam 21: Supplement D Linear Programming87 Questions
Exam 22: Supplement E Simulation54 Questions
Exam 23: Supplement F Financial Analysis55 Questions
Exam 24: Supplement G Acceptance Sampling Plans87 Questions
Exam 25: Supplement H Measuring Output Rates108 Questions
Exam 26: Supplement I Learning Curve Analysis50 Questions
Select questions type
A(n) ________ is inventory carried into a week but too small to prevent a shortage.
(Short Answer)
4.9/5
(38)
If a planned receipt for an item is due in week 6 and the item's lead time is two weeks, in which week will the corresponding planned order release occur?
(Multiple Choice)
4.9/5
(38)
Scenario 11.1
Sunshine Manufacturing produces three products: X, Y, Z. The production of these end items is controlled by an MRP system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled with two components of C and one component of A. End item Z is assembled from one unit of D and one unit of C; D is manufactured from one unit of A; and C is manufactured from one unit of B.
-Use the information in Scenario 11.1. If item C has a manufacturing lead time of two weeks, and a planned receipt of 65 units is needed in week 4, which of the following statements is True?
(Multiple Choice)
4.7/5
(33)
________ is a lot-sizing rule under which the lot size ordered covers the gross requirements of a single week.
(Short Answer)
4.9/5
(31)
Gross requirements are the total demand derived from all parent production plans.
(True/False)
4.8/5
(44)
Table 11.2
Mutts Amazing Dogs has developed the following demand forecast for The Pitbull, a spicy concoction graced by pepperjack cheese, serrano, habanero, poblano and jalapeno peppers, onion, and a cilantro-lime aioli. They enter the planning period with 20 hotdogs in inventory as shown in Week 0. A few customers have standing orders for hotdogs and they have booked catering events over the next two months. They buy their hotdogs in packages of ten just like you and me.
-Use Table 11.2 to answer this question. What should the MPS quantity be for week 5?

(Multiple Choice)
4.7/5
(35)
A technique used for projecting time-phased capacity requirements for workstations is called:
(Multiple Choice)
5.0/5
(36)
Explain the difference between independent and dependent demand and illustrate your explanation with an example.
(Essay)
5.0/5
(36)
The periodic order quantity (POQ) rule tends to keep more inventory on hand than the lot-for-lot rule, but less inventory on hand than the fixed order quantity rule.
(True/False)
4.7/5
(40)
Use the following partially completed MRP record to answer the question.
What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1, 2, 3, 4, 5, and 6)?

(Multiple Choice)
4.9/5
(36)
A(n) ________ is a record of a service firm's parent-component relationships with all of the materials, equipment, time, staff, and other productive assets associated with them, including usage quantities.
(Short Answer)
4.8/5
(36)
Facilitating goods in a hotel's bill of resources would include a:
(Multiple Choice)
4.8/5
(33)
Available-to-promise inventory is the amount of end items that marketing can promise to customers by a certain date.
(True/False)
4.7/5
(36)
Among the four core processes of an organization that link activities within and across firms in a supply chain, the ________ interacts with all of them either through its inputs or outputs.
(Short Answer)
4.9/5
(29)
________ is the degree to which a component has more than one immediate parent.
(Short Answer)
4.8/5
(31)
Management wishes to use a POQ lot-sizing rule for an item that experiences an average demand of 30 units per week. If the desired average lot size is 120 units, what should P be?
(Multiple Choice)
4.8/5
(40)
Showing 41 - 60 of 124
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)