Exam 8: Human Resources
Exam 1: Introduction to Operations and Supply Chain Management102 Questions
Exam 2: Quality Management88 Questions
Exam 3: Statistical Process Control157 Questions
Exam 4: Product Design95 Questions
Exam 5: Service Design91 Questions
Exam 6: Processes and Technology81 Questions
Exam 7: Capacity and Facilities Design128 Questions
Exam 8: Human Resources131 Questions
Exam 9: Project Management106 Questions
Exam 10: Supply Chain Management Strategy and Design72 Questions
Exam 11: Global Supply Chain Procurement and Distribution122 Questions
Exam 12: Forecasting92 Questions
Exam 13: Inventory Management127 Questions
Exam 14: Sales and Operations Planning123 Questions
Exam 15: Resource Planning97 Questions
Exam 16: Lean Systems88 Questions
Exam 17: Scheduling96 Questions
Select questions type
A graph that reflects the fact that repetition of tasks improves worker performance is referred to as a learning curve.
(True/False)
4.7/5
(30)
How many observations should be taken to be 95% confident of being within
5% of the actual time a machine is busy if it is believed that the machine is in use 75% of the time?

(Multiple Choice)
4.9/5
(32)
Use learning curves for measuring work improvement, planning, and scheduling.
(Essay)
4.9/5
(39)
Advantages of telecommuting include all of the following except
(Multiple Choice)
4.9/5
(40)
List 5 of the attributes of good job design identified by Frederick Herzberg.
(Essay)
5.0/5
(41)
In a piece-rate wage system, pay is based on the efficiency of the overall process.
(True/False)
4.8/5
(30)
As part of a time study a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported:
Assuming an allowance factor of 20% the standard time for this job would be

(Multiple Choice)
4.9/5
(40)
How many cycles should be used in a time study in order to be 98% confident that the time-study average job cycle time is within 4% of the true average job cycle time? Assume that the average job cycle time was 4.25 minutes and the standard deviation of the sample was 0.65 minutes.
(Multiple Choice)
4.7/5
(43)
The following are characteristics of good ergonomics except
(Multiple Choice)
4.7/5
(38)
A graph that illustrates the improvement rate of workers as a job is repeated is known as a
(Multiple Choice)
4.9/5
(44)
Scientific management divides jobs into their most elemental activities to simplify job design.
(True/False)
4.9/5
(29)
The most critical elements in the process of successfully managing diversity are the following except
(Multiple Choice)
4.8/5
(40)
The amount of time a worker and a machine are working or idle on a job is illustrated by a
(Multiple Choice)
4.8/5
(44)
Explain the history and principles of scientific management and subsequent employee motivation theories.
(Essay)
4.9/5
(36)
For a particular time study a company would like to be 90% confident that the average job cycle time is within 5% of the true average job cycle time. Assume that the average job cycle time was 15.76 minutes and the standard deviation of the sample was 3.2 minutes. The number of cycles that should be used in this time study would be
(Multiple Choice)
4.8/5
(31)
Empowerment involves giving employees the authority and responsibility to innovate and act on their own.
(True/False)
4.9/5
(41)
One advantage of an individual piece-rate system is that it provides strong incentives to ensure high quality.
(True/False)
4.8/5
(41)
Showing 81 - 100 of 131
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)