Exam 7: Quality and Innovation in Product and Process Design
Exam 1: Differing Perspectives on Quality119 Questions
Exam 2: Quality Theory90 Questions
Exam 3: Global Supply Chain Quality and International Quality Standards100 Questions
Exam 4: Strategic Quality Planning91 Questions
Exam 5: The Voice of the Customer100 Questions
Exam 6: The Voice of the Market90 Questions
Exam 7: Quality and Innovation in Product and Process Design93 Questions
Exam 8: Designing Quality Services90 Questions
Exam 9: Managing Supplier Quality in the Supply Chain65 Questions
Exam 10: The Tools of Quality90 Questions
Exam 11: Statistically Based Quality Improvement for Variables105 Questions
Exam 12: Statistically Based Quality Improvement for Attributes90 Questions
Exam 13: Six Sigma Management and Lean Tools90 Questions
Exam 14: Managing Quality Improvement Teams and Projects91 Questions
Exam 15: Implementing and Validating the Quality System70 Questions
Select questions type
During the technology selection for product development stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.
Free
(True/False)
4.9/5
(41)
Correct Answer:
True
The over-the-wall syndrome refers to difficulties that arise when the design products become complicated to build.
Free
(True/False)
4.8/5
(43)
Correct Answer:
False
What is the first step in failure modes and effects analysis?
Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
A
Design for manufacture methods are designed to radically increase cycle times.
(True/False)
4.9/5
(44)
________ describes a method for translating customer requirements into functional design.
(Multiple Choice)
4.8/5
(27)
Enterprise resource planning systems are used to integrate financial, planning, and control systems into a single architecture.
(True/False)
4.8/5
(31)
Describe the failure modes, effects, and criticality analysis (FMECA).
(Essay)
4.8/5
(36)
The first step in performing quality function deployment is to develop a listing of technical design elements along the roof of the house.
(True/False)
4.8/5
(30)
Which of the following is an external source for product ideas?
(Multiple Choice)
4.9/5
(35)
The ________ component of a CAD system allows for the cataloging and standardization of parts and components for complex products.
(Multiple Choice)
4.9/5
(37)
During ________ stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.
(Multiple Choice)
4.9/5
(41)
________ means to design products so that they are cost-effective and simple to build.
(Multiple Choice)
4.8/5
(43)
Computer-aided inspection is performed by infrared and noncontact sensors.
(True/False)
4.9/5
(28)
A particular customer requirement has a strong association with a technical requirement, an importance of 6, a target value of 3, and a sales point value of 2. The absolute weight of this customer requirement is ________.
(Multiple Choice)
4.8/5
(36)
Failure modes and effects analysis results in reduction in product development cost.
(True/False)
5.0/5
(35)
R&D-generated ideas tend to be more incremental than marketing-generated ideas, and are better aligned with customer needs.
(True/False)
4.9/5
(36)
________ involves the usage of heat-transfer calculations, stress calculations, or differential equations to determine the dynamic behavior of the system being designed.
(Multiple Choice)
4.7/5
(36)
Showing 1 - 20 of 93
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)