Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
Which of the following is the primary concern of capacity control?
(Multiple Choice)
4.9/5
(40)
When CRP loads all the work centers without regard to the actual capacity available in the work center,this type of loading is called ______.
(Multiple Choice)
4.8/5
(29)
Which of the following statements is true about open loop MRP systems?
(Multiple Choice)
4.9/5
(34)
The goal of ______ is to regulate both the flow of work orders and work center capacities in order to achieve a steady flow of work with minimal load back-up.
(Multiple Choice)
4.7/5
(42)
______ is the coordination of all activities related to production by providing consistent data to all participants involved in various stages of the production process.
(Multiple Choice)
4.9/5
(39)
The module in ERP that includes product differentiation and industry specific functionality is ______.
(Multiple Choice)
4.8/5
(44)
Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard labor hours of load requirements are ______.
(Multiple Choice)
4.7/5
(33)
Work-in-process inventory builds up at the work station when ______.
(Multiple Choice)
4.8/5
(35)
Which of the following statements is FALSE about ERP systems?
(Multiple Choice)
4.8/5
(41)
Which of the following is NOT an application included in the human resource management module in an ERP system?
(Multiple Choice)
4.8/5
(31)
Which of the following is NOT an acceptable way to increase capacity?
(Multiple Choice)
4.9/5
(42)
In the context of a CRP system,a ______ represents the setup time plus run time required from a specific work center.
(Multiple Choice)
4.9/5
(41)
Which of the following is NOT an application included in the customer relationship management module in an ERP system?
(Multiple Choice)
4.8/5
(42)
______ refers to the production capability of a facility per unit of time.
(Multiple Choice)
4.8/5
(36)
Which of the following statements is FALSE about MRP II systems?
(Multiple Choice)
4.9/5
(42)