Which of the following is the primary concern of capacity control?

(Multiple Choice)
4.9/5
(40)

When CRP loads all the work centers without regard to the actual capacity available in the work center,this type of loading is called ______.

(Multiple Choice)
4.8/5
(29)

Which of the following is NOT a key input to a CRP system?

(Multiple Choice)
4.8/5
(27)

Which of the following statements is true about open loop MRP systems?

(Multiple Choice)
4.9/5
(34)

The goal of ______ is to regulate both the flow of work orders and work center capacities in order to achieve a steady flow of work with minimal load back-up.

(Multiple Choice)
4.7/5
(42)

______ is the coordination of all activities related to production by providing consistent data to all participants involved in various stages of the production process.

(Multiple Choice)
4.9/5
(39)

Which of the following is FALSE about MRP II?

(Multiple Choice)
4.9/5
(40)

The module in ERP that includes product differentiation and industry specific functionality is ______.

(Multiple Choice)
4.8/5
(44)

Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard labor hours of load requirements are ______.

(Multiple Choice)
4.7/5
(33)

Work-in-process inventory builds up at the work station when ______.

(Multiple Choice)
4.8/5
(35)

Which of the following statements is FALSE about ERP systems?

(Multiple Choice)
4.8/5
(41)

Which of the following is NOT an application included in the human resource management module in an ERP system?

(Multiple Choice)
4.8/5
(31)

Which of the following is NOT an acceptable way to increase capacity?

(Multiple Choice)
4.9/5
(42)

When we use lot splitting,we ______.

(Multiple Choice)
4.7/5
(33)

In the context of a CRP system,a ______ represents the setup time plus run time required from a specific work center.

(Multiple Choice)
4.9/5
(41)

DRP is similar to ______.

(Multiple Choice)
4.7/5
(45)

Which of the following is NOT an application included in the customer relationship management module in an ERP system?

(Multiple Choice)
4.8/5
(42)

______ refers to the production capability of a facility per unit of time.

(Multiple Choice)
4.8/5
(36)

Which of the following statements is FALSE about MRP II systems?

(Multiple Choice)
4.9/5
(42)

DRP is used by companies to ______.

(Multiple Choice)
4.7/5
(39)