Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements is true with regard to DRP?

(Multiple Choice)
4.8/5
(39)

A process that enables a company to analyze the capabilities of its operation system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is ______.

(Multiple Choice)
4.8/5
(40)

Which of the following statements is FALSE about lot splitting?

(Multiple Choice)
4.8/5
(33)

The ______ systems used in health care serve a similar function to organizations employing EPR systems.

(Multiple Choice)
4.9/5
(43)

The process of setting loading limits on the amount of load assigned to each work center per period is ______.

(Multiple Choice)
4.9/5
(38)

In capacity requirements planning,we project or estimate ______.

(Multiple Choice)
4.7/5
(34)

Which of the following statements about MRP II is true?

(Multiple Choice)
4.8/5
(39)

The ______ system has a provision for feedback that enables plans generated by the system to be checked and adjusted.

(Multiple Choice)
5.0/5
(42)

Which of the following is NOT a benefit of the DRP system?

(Multiple Choice)
4.7/5
(28)

Which of the following is NOT an application included in the supply chain management module in an ERP system?

(Multiple Choice)
4.9/5
(36)

The following is data that can be entered into the ______ system: customer order entry,ripples through the enterprise changing inventory,production schedules,accounts payable,balance sheet,materials reordering,and shipping schedules.

(Multiple Choice)
4.8/5
(40)

If it is not possible to increase capacity,then ______.

(Multiple Choice)
4.8/5
(41)

Improved on-time delivery,improved quality performance,and improved supplier relations are benefits of ______ on supply chain performance.

(Multiple Choice)
5.0/5
(32)

The division of a single lot into two or more sublots and the simultaneously processing of each sublot on identical (or very similar)work centers as separate lots is called ______.

(Multiple Choice)
4.8/5
(32)

Which of the following is a limitation of the ERP systems?

(Multiple Choice)
4.8/5
(39)

The CRP system converts tentative planned shop orders into standard hours of load by ______.

(Multiple Choice)
4.8/5
(35)

Business in the ______ sector have to first assess their operations' needs before selecting a specific ERP package.

(Multiple Choice)
4.8/5
(39)

The process that enables a company to analyze the capabilities of its operations system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is called ______.

(Multiple Choice)
4.9/5
(40)

Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard machine hours of load requirements are ______.

(Multiple Choice)
4.9/5
(43)

The DRP process typically begins ______.

(Multiple Choice)
4.9/5
(39)