Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
A system that enables plans to be adjusted according to capacity and other requirements by synchronizing material purchase and component production plans with the master schedule and by providing feedback on manufactured items and materials on hand is a ______.
(Multiple Choice)
5.0/5
(39)
An advantage of infinite loading is that it enables planners to ______.
(Multiple Choice)
4.8/5
(40)
In which module of the ERP system is most of the product differentiation,including industry specific functionality,incorporated?
(Multiple Choice)
4.8/5
(32)
The amount of planned work scheduled and actual work assigned to a production facility for a specific period of time is called a ______.
(Multiple Choice)
4.9/5
(34)
Manufacturing resource planning (MRP II)is an extension of the ______ system.
(Multiple Choice)
4.8/5
(33)
Which of the following statements is FALSE about using ERP systems to promote greater sustainability?
(Multiple Choice)
4.7/5
(39)
Which module of the ERP system includes tools for financial management,such as creating and adhering to budgets,cash-flow management,expense management,risk management,and tax management?
(Multiple Choice)
4.9/5
(31)
______ is the division of a single lot into two or more sublots and simultaneously processing each sublot on identical (or very similar)work centers as separate lots.
(Multiple Choice)
4.9/5
(33)
Which module of the ERP system includes applications that provide customers with sales quotes,schedule orders,print shipping labels,generate leads,and create sales literature?
(Multiple Choice)
4.7/5
(36)
Capacity planning for the ______.time range is called capacity requirements planning (CRP).
(Multiple Choice)
4.9/5
(33)
The goal of CRP is to regulate both the flow of work orders and work center capacities in order to ______.
(Multiple Choice)
4.8/5
(41)
Distribution requirements planning (DRP)is also known as ______.
(Multiple Choice)
5.0/5
(32)
Finite loading is best suited for ______ capacity control decisions.
(Multiple Choice)
5.0/5
(34)
When loading limits are set on the amount of load assigned to each work center per period,this is referred to as ______.
(Multiple Choice)
4.7/5
(42)
The process of loading all the work centers without regard to the actual capacity available in the work center is called ______.
(Multiple Choice)
4.7/5
(41)
By generating accurate forecasts of demand,time-phased delivery schedules can be developed.This is the underlying idea behind the ______ system.
(Multiple Choice)
4.8/5
(31)
Developing MRP plans and schedules by assuming infinite capacity and on-time,correct delivery of materials ordered by the suppliers is known as ______.
(Multiple Choice)
4.9/5
(31)
The amount of planned work scheduled and actual work assigned to a production facility for a specified period of time is a ______.
(Multiple Choice)
4.8/5
(35)
Which of the following is NOT a key input to a CRP system?
(Multiple Choice)
4.8/5
(42)
Showing 81 - 100 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)