Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A system that enables plans to be adjusted according to capacity and other requirements by synchronizing material purchase and component production plans with the master schedule and by providing feedback on manufactured items and materials on hand is a ______.

(Multiple Choice)
5.0/5
(39)

An advantage of infinite loading is that it enables planners to ______.

(Multiple Choice)
4.8/5
(40)

In which module of the ERP system is most of the product differentiation,including industry specific functionality,incorporated?

(Multiple Choice)
4.8/5
(32)

The amount of planned work scheduled and actual work assigned to a production facility for a specific period of time is called a ______.

(Multiple Choice)
4.9/5
(34)

Manufacturing resource planning (MRP II)is an extension of the ______ system.

(Multiple Choice)
4.8/5
(33)

Which of the following statements is FALSE about using ERP systems to promote greater sustainability?

(Multiple Choice)
4.7/5
(39)

Which module of the ERP system includes tools for financial management,such as creating and adhering to budgets,cash-flow management,expense management,risk management,and tax management?

(Multiple Choice)
4.9/5
(31)

Which of the following is NOT a benefit of MRP II systems?

(Multiple Choice)
4.7/5
(36)

______ is the division of a single lot into two or more sublots and simultaneously processing each sublot on identical (or very similar)work centers as separate lots.

(Multiple Choice)
4.9/5
(33)

Which module of the ERP system includes applications that provide customers with sales quotes,schedule orders,print shipping labels,generate leads,and create sales literature?

(Multiple Choice)
4.7/5
(36)

Capacity planning for the ______.time range is called capacity requirements planning (CRP).

(Multiple Choice)
4.9/5
(33)

The goal of CRP is to regulate both the flow of work orders and work center capacities in order to ______.

(Multiple Choice)
4.8/5
(41)

Distribution requirements planning (DRP)is also known as ______.

(Multiple Choice)
5.0/5
(32)

Finite loading is best suited for ______ capacity control decisions.

(Multiple Choice)
5.0/5
(34)

When loading limits are set on the amount of load assigned to each work center per period,this is referred to as ______.

(Multiple Choice)
4.7/5
(42)

The process of loading all the work centers without regard to the actual capacity available in the work center is called ______.

(Multiple Choice)
4.7/5
(41)

By generating accurate forecasts of demand,time-phased delivery schedules can be developed.This is the underlying idea behind the ______ system.

(Multiple Choice)
4.8/5
(31)

Developing MRP plans and schedules by assuming infinite capacity and on-time,correct delivery of materials ordered by the suppliers is known as ______.

(Multiple Choice)
4.9/5
(31)

The amount of planned work scheduled and actual work assigned to a production facility for a specified period of time is a ______.

(Multiple Choice)
4.8/5
(35)

Which of the following is NOT a key input to a CRP system?

(Multiple Choice)
4.8/5
(42)