Exam 15: B: Just-In-Time and Lean Production

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In the broadest sense,preventive maintenance extends back to the installation stage of equipment and facilities.

(True/False)
4.9/5
(41)

Reliability-centered maintenance is an approach based on;

(Multiple Choice)
4.9/5
(33)

The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?

(Essay)
4.9/5
(31)

Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following EXCEPT:

(Multiple Choice)
4.9/5
(36)

Which of the following is most closely associated with breakdown maintenance?

(Multiple Choice)
4.9/5
(32)

Maintenance activities are often organized into the two groups:

(Multiple Choice)
4.9/5
(43)

In the area of maintenance,there is a trade-off between the cost of preventive maintenance and breakdown (emergency)maintenance.

(True/False)
4.7/5
(36)

The optimum amount of preventive maintenance is where:

(Multiple Choice)
4.9/5
(29)

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?

(Essay)
4.9/5
(40)

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?

(Essay)
4.8/5
(40)

The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down? The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?

(Essay)
4.7/5
(41)

Ideally,preventive maintenance will be performed:

(Multiple Choice)
4.7/5
(35)
Showing 21 - 32 of 32
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)