Exam 15: B: Just-In-Time and Lean Production
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
In the broadest sense,preventive maintenance extends back to the installation stage of equipment and facilities.
(True/False)
4.9/5
(41)
The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?
(Essay)
4.9/5
(31)
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following EXCEPT:
(Multiple Choice)
4.9/5
(36)
Which of the following is most closely associated with breakdown maintenance?
(Multiple Choice)
4.9/5
(32)
Maintenance activities are often organized into the two groups:
(Multiple Choice)
4.9/5
(43)
In the area of maintenance,there is a trade-off between the cost of preventive maintenance and breakdown (emergency)maintenance.
(True/False)
4.7/5
(36)
The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?
(Essay)
4.9/5
(40)
The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?
(Essay)
4.8/5
(40)
The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?


(Essay)
4.7/5
(41)
Showing 21 - 32 of 32
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)