Exam 17: Project Management
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
The latest starting time for an activity is equal to the latest finish time minus the activity time.
Free
(True/False)
4.9/5
(29)
Correct Answer:
True
In the probabilistic approach to precedence network analysis,the duration estimate annotated "tm" for any activity is the:
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
C
-What are the estimated expected (mean)durations (in weeks)for activities A-H?

Free
(Short Answer)
4.8/5
(26)
Correct Answer:
15; 20; 10; 35; 25; 30; 20; 5
What is the probability that this project will be completed within 205 days?
(Multiple Choice)
4.9/5
(33)
In "crashing",a project manager will generally focus on activities which:
(Multiple Choice)
4.8/5
(25)
Purchase planning is typically outside the scope of project planning activities.
(True/False)
4.9/5
(31)
Determine the amount of slack in each of a project's activities (see the list below),and identify those which are on the critical path.


(Essay)
4.9/5
(29)
Which of the following is not a form of risk reduction in project management?
(Multiple Choice)
4.7/5
(35)
A hierarchical listing of what must be done during the project is called:
(Multiple Choice)
4.8/5
(28)
The standard deviation of the duration of the critical path is equal to the square root of the sum of the variances of all of the activities on the critical path.
(True/False)
4.9/5
(25)
A PERT/CPM activity has an optimistic duration estimate of 3 days,a most likely duration estimate of 8 days,and a pessimistic duration estimate of 10 days.The expected duration of this activity te is:
(Multiple Choice)
4.7/5
(35)
The project management strategy of injecting additional resources in order to reduce the length of the project is called:
(Multiple Choice)
4.8/5
(35)
The life cycle of a project includes which of the following phases?
I.Initiation
II.Planning and scheduling
III.Growth and maturity
IV.Closeout
(Multiple Choice)
5.0/5
(35)
The principal advantage a Gantt chart has over other project scheduling techniques is:
(Multiple Choice)
4.8/5
(35)
Consecutive activities on the same path have shared slack,which means if activities are delayed,the amount of slack remaining is reduced for all these activities without delaying completion of the project.
(True/False)
4.8/5
(37)
The standard deviation of a project duration is equal to the sum of the variances of all the activities of the project.
(True/False)
4.9/5
(34)
What is the estimated standard deviation of the duration for activity E?
(Multiple Choice)
4.9/5
(45)