Exam 7: B: Design of Work Systems
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
How long would a job with a 70 percent learning curve and a time of 20 hours for the first unit require (approximately,in hours)for the third unit?
Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
B
A job has an 80% learning curve.If the first unit took 40 hours to complete,the fourth unit should take roughly how many hours?
Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
B
The learning percentage can be determined from a learning curve table.
Free
(True/False)
4.7/5
(38)
Correct Answer:
False
A job has a 90 percent learning curve associated with it.The second unit of a 25-unit job had a unit time of 36 minutes.What will the total time be for the entire job?
(Essay)
4.9/5
(23)
A company is preparing a bid on a government contract for 40 units of a certain product.The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours,respectively.Approximately how long will it take to produce the last ten units?
(Multiple Choice)
4.9/5
(32)
A job is expected to have a 70 percent learning curve.The first unit has been completed in 20 hours.Accordingly,the second unit can be expected to take approximately how many hours?
(Multiple Choice)
4.8/5
(31)
Once production is underway and the learning curve effect is occurring,successive changes made to the production process will cause the time per unit to:
(Multiple Choice)
4.9/5
(38)
A manager wants to analyze the learning curve associated with producing one of his company's products.Accordingly,he has gathered the following data:
How long did it take to produce the first unit?

(Multiple Choice)
4.9/5
(37)
If an 80% curve is appropriate for a task and the first unit takes ten hours,the average time for the first two units would be eight hours.
(True/False)
4.9/5
(38)
A manager wants to analyze the learning curve associated with producing one of his company's products.Accordingly,he has gathered the following data:
What is the learning curve percentage?

(Multiple Choice)
4.8/5
(41)
For an 80% learning curve,if the first unit requires 10 hours,the second unit will require 8 hours,and the third 6.4 hours.
(True/False)
4.9/5
(38)
For the same type of work,learning curves may differ from organization to organization.
(True/False)
4.8/5
(26)
According to learning curve theory,every doubling of total output will produce a constant percentage decrease in time per unit.
(True/False)
4.8/5
(38)
A company is preparing a bid on a government contract for 40 units of a certain product.The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours,respectively.What is the appropriate learning curve?
(Multiple Choice)
4.9/5
(32)
Learning curves are mostly relevant for routine,repetitive activities.
(True/False)
4.9/5
(35)
Which of the following conveys the essence of learning curves?
(Multiple Choice)
4.9/5
(37)
Ron has noted that the first accounting problem he did in a set of similar problems took him one hour,and the ninth problem took 24 minutes.
(i)Estimate Ron's learning curve.
(ii)About how long did it take Ron to do his set of 10 problems?
(Essay)
4.8/5
(32)
According to learning curve theory,the time reduction per unit decreases as the number of units increases.
(True/False)
4.8/5
(37)
Learning curves generally apply to situations in which there is a high degree of human involvement,and tasks are fairly repetitive.
(True/False)
4.8/5