Exam 6: A: Process Design and Facility Layout

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For output to equal projected demand,what will be the last task performed at the second workstation of the production line which uses the minimum number of workstations?

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

E

For output to equal projected demand,what will be the efficiency of the assembly line that uses the minimum number of workstations?

Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
Verified

D

An advantage of a U-shaped production line is:

Free
(Multiple Choice)
4.7/5
(39)
Correct Answer:
Verified

E

  Given the information above,assign the departments A through I to locations in a 3 x 3 grid,with department E fixed in the lower right-hand corner. Given the information above,assign the departments A through I to locations in a 3 x 3 grid,with department E fixed in the lower right-hand corner.

(Essay)
4.8/5
(31)

Repetitive production processes produce a high volume of standardized products or services.

(True/False)
4.9/5
(38)

Which of the following is a suggestion to improve customer perception in services?

(Multiple Choice)
4.9/5
(46)

Continuous processing is employed when a customized output is required.

(True/False)
4.8/5
(36)

If the company desires that output rate equal demand,what is the last task performed in the first workstation in the balance which uses the minimum number of workstations?

(Multiple Choice)
4.8/5
(34)

Given the following line balance data: Given the following line balance data:    -For eight hours of operating time per day and a desired output rate of 960 units per day,what balance (if any)will yield the minimum number of stations? -For eight hours of operating time per day and a desired output rate of 960 units per day,what balance (if any)will yield the minimum number of stations?

(Essay)
4.9/5
(40)

Which of the following is associated with service process design rather than the design of manufacturing processes?

(Multiple Choice)
4.7/5
(43)

For line balancing,cycle time is computed as:

(Multiple Choice)
4.9/5
(39)

Which of the following is a factor considered in make-or-buy decisions?

(Multiple Choice)
4.7/5
(41)

What is the total flow (loads per week)between department Y and department Z?

(Multiple Choice)
5.0/5
(36)

Given the following line balance data: Given the following line balance data:    -What is the minimum possible cycle time? -What is the minimum possible cycle time?

(Short Answer)
4.8/5
(32)

Programmable automation requires less changeover time than flexible automation.

(True/False)
4.9/5
(32)

Which term is most closely associated with group technology?

(Multiple Choice)
4.9/5
(32)

Determine the minimum number of workstations needed for this situation: Operating time is 450 minutes per day. Desired output is 80 units per day. The sum of task times is 56 minutes.

(Essay)
4.8/5
(37)

Which of the following is not used to avoid costly shutdowns in product layouts?

(Multiple Choice)
4.9/5
(41)

If a line is balanced with 90 percent efficiency,the "balance delay" would be:

(Multiple Choice)
4.8/5
(38)

In general,batch process systems require a more skilled and flexible workforce than job shops because batch processes produce more varied goods and services.

(True/False)
4.7/5
(35)
Showing 1 - 20 of 157
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)