Exam 15: A: Just-In-Time and Lean Production
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
The control of the flow of work in JIT systems can be characterized as a backward communication approach.
(True/False)
4.8/5
(31)
Reductions in setup time are necessary to make a JIT system feasible.
(True/False)
4.8/5
(42)
Which of the following are potentially negative aspects of cross-functionally trained workers?
I.Less motivated workforce based on reduced decision making authority
II.Less flexibility because workers are less able to assist one another
III.Higher stress levels from added responsibility and a continued push to improve
(Multiple Choice)
4.7/5
(34)
The JIT philosophy recognizes that a buffer inventory is necessary.
(True/False)
4.8/5
(33)
Flexible systems undermine the goals of JIT and lean systems to have a balanced,rapid flow of products.
(True/False)
4.9/5
(28)
Setup time and cost can often be reduced by the use of group technology.
(True/False)
4.8/5
(39)
For JIT/lean companies,certification of suppliers using a system such as ISO 9001 provides a cost effective alternative to having to develop close supplier relationships.
(True/False)
4.9/5
(37)
Which of the following is not a goal of JIT/lean production?
(Multiple Choice)
4.8/5
(34)
Which one of the following is not affiliated with product design to support JIT/lean operations?
(Multiple Choice)
4.9/5
(30)
The small lot-sizing policy works well in a situation where both holding costs and setup costs are high.
(True/False)
4.8/5
(31)
"Group technology" can be used to reduce setup cost and time in a JIT conversion.
(True/False)
4.7/5
(34)
Which of the following is not true about worker/management roles and relations for JIT?
(Multiple Choice)
4.8/5
(35)
Which of the following is not associated with converting to cellular layouts?
(Multiple Choice)
4.8/5
(35)
Which of the following is a benefit of small lot sizes in JIT systems?
(Multiple Choice)
4.7/5
(31)
The purpose of an andon is to provide an immediate visual signal indicating when and where problems are occurring in a process.
(True/False)
4.9/5
(39)