Exam 7: Process Selection, Design, and Analysis
Exam 1: Goods, Services, and Operations Management81 Questions
Exam 2: Value Chains87 Questions
Exam 3: Measuring Performance in Operations98 Questions
Exam 4: Operations Strategy82 Questions
Exam 5: Technology and Operations Management77 Questions
Exam 6: Goods and Service Design118 Questions
Exam 7: Process Selection, Design, and Analysis116 Questions
Exam 8: Facility and Work Designs92 Questions
Exam 9: Supply Chain Design87 Questions
Exam 10: Capacity Management89 Questions
Exam 11: Forecasting and Demand Planning95 Questions
Exam 12: Managing Inventories117 Questions
Exam 13: Resource Management106 Questions
Exam 14: Operations Scheduling and Sequencing79 Questions
Exam 15: Quality Management81 Questions
Exam 15: Appendix: Quality Management56 Questions
Exam 16: Quality Control and Spc110 Questions
Exam 16: Appendix: Queuing Analysis38 Questions
Exam 17: Appendix: Modeling Using Linear Programming41 Questions
Exam 17: Lean Operating Systems84 Questions
Exam 18: Appendix: Simulation40 Questions
Exam 18: Project Management108 Questions
Exam 19: Appendix: Decision Analysis44 Questions
Select questions type
Automobile factories and hospital laboratory work are examples of:
(Multiple Choice)
4.7/5
(41)
_____ processes are organized around particular types of general-purpose equipment that are flexible and capable of customizing work for individual customers
(Multiple Choice)
5.0/5
(32)
Which of the following statement is TRUE about a process map (flowchart)?
(Multiple Choice)
4.9/5
(38)
The Department of Motor Vehicle (DMV) testing center has eight (8) testers who test 60 drivers in total per day. Each tester can test ten (10) drivers per day. What is the center's utilization?
(Essay)
4.8/5
(35)
Job shop processes use flexible, general purpose equipment that is capable of customizing work for individual customers.
(True/False)
4.8/5
(35)
As one moves up the hierarchy of work, the total number of tasks that must be coordinated becomes larger.
(True/False)
4.8/5
(34)
_____is the fraction of time a workstation or individual is busy over the long run.
(Multiple Choice)
4.8/5
(27)
The average number of entities completed per unit time-the output rate-from a process is called _____.
(Multiple Choice)
4.8/5
(38)
Explain and differentiate between the characteristics of a project, job shop, flow shop, and continuous flow process.
(Essay)
4.9/5
(28)
A group of tasks needed to create and deliver an intermediate or final output is called an activity.
(True/False)
4.8/5
(30)
The product-process matrix works well for both goods and services.
(True/False)
4.9/5
(30)
An automobile emission testing center tests 50 vehicles per hour. Each inspector can inspect one vehicle every four minutes. If the center wants a utilization of 90%, how many inspectors are required?
(Multiple Choice)
4.8/5
(30)
The average number of hotel rooms occupied per day during the month of March is 225. Rooms are booked on average for 2.5 days. On average, how many new bookings occur each day?
(Multiple Choice)
4.8/5
(36)
What is the implied service rate at a bank teller's window if demand is 26 customers per hour and the bank staffs are 3 tellers with an average utilization of 80%?
(Multiple Choice)
4.9/5
(39)
A process map and a value stream map are two terms for the same thing.
(True/False)
4.9/5
(29)
Differentiate between custom, option, and standard goods and services. Also, give a goods and a service example of each.
(Essay)
4.9/5
(37)
Which statement is TRUE regarding the Community Medical Association (CMA) case study in Chapter 17 that we discussed in class?
(Multiple Choice)
4.8/5
(39)
In designing processes, one often starts at the detail level and moves progressively toward the aggregate.
(True/False)
4.9/5
(36)
Showing 61 - 80 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)