Exam 17: Lean Operating Systems
Exam 1: Goods, Services, and Operations Management65 Questions
Exam 2: Value Chains68 Questions
Exam 3: Measuring Performance in Operations80 Questions
Exam 4: Operations Strategy65 Questions
Exam 5: Technology and Operations Management72 Questions
Exam 6: Goods and Service Design91 Questions
Exam 7: Process Selection, Design, and Analysis88 Questions
Exam 8: Facility and Work Design78 Questions
Exam 9: Supply Chain Design71 Questions
Exam 10: Capacity Management70 Questions
Exam 11: Forecasting and Demand Planning77 Questions
Exam 12: Managing Inventories89 Questions
Exam 13: Resource Management88 Questions
Exam 14: Operations Scheduling and Sequencing66 Questions
Exam 15: Quality Management72 Questions
Exam 16: Quality Control and Spc85 Questions
Exam 17: Lean Operating Systems63 Questions
Exam 18: Project Management63 Questions
Exam 19: Work Measurement, Learning Curves, and Standards57 Questions
Exam 20: Queuing Analysis38 Questions
Exam 21: Modeling Using Linear Programming44 Questions
Exam 22: Simulation38 Questions
Exam 23: Decision Analysis44 Questions
Select questions type
Lean principles are of primary benefit to manufacturers and provide little value to service organizations.
Free
(True/False)
5.0/5
(29)
Correct Answer:
False
Production Kanbans trigger the movement of parts.
Free
(True/False)
4.9/5
(38)
Correct Answer:
False
According to the Toyota Motor Company, which of the following is not one of the seven major waste categories?
Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
D
The goal of total productive maintenance is to minimize the costs associated with routine maintenance activities.
(True/False)
4.8/5
(42)
Quick setup or changeover of tooling and fixtures is associated with ____.
(Multiple Choice)
4.8/5
(37)
The 5Ss focus on improving waste generated by inefficient transportation.
(True/False)
4.8/5
(37)
Hinge Manufacturing Company employs a Kanban system for a component part.The daily demand is 900 hinges.Each container has a wait time of 0.05/day, and a processing time of 0.37 days.The Container size is 60 hinges and the safety factor ( ) is 10%.
a.How many Kanban card sets should be authorized?
b.What is the maximum inventory of this hinge in the system?
(Essay)
4.8/5
(37)
In a Kanban system, the numerator of the formula K =[d(p + w)(1 + )]/C is analogous to
(Multiple Choice)
4.7/5
(33)
In a push system, finished goods inventory is produced in advance of customer demand using a forecast of sales.
(True/False)
4.9/5
(29)
Long lead-times and higher work-in-process is most closely related to which of Toyota's "Seven Major Waste Categories?"
(Multiple Choice)
4.9/5
(34)
In a JIT system, the computer inventory data is the interface and control point between customers and supply cycles.
(True/False)
4.9/5
(34)
In lean thinking, waste need not be classified as simply material waste such as scrap and defective parts.
(True/False)
4.8/5
(32)
Single minute exchange of dies (SMED) frees up capacity for other productive uses.
(True/False)
4.7/5
(25)
Showing 1 - 20 of 63
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)