Exam 21: Operational Decision-Making Tools: Work Measurement
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
How many observations should be taken to be 95% confident of being within
5% of the actual time a machine is busy if it is believed that the machine is in use 75% of the time?

(Multiple Choice)
4.8/5
(38)
Under normal circumstances and conditions,the time required by an "average" worker to perform a job once is referred to as the cycle time.
(True/False)
4.8/5
(41)
Briefly discuss the advantages and disadvantages of a predetermined motion time system.
(Essay)
4.7/5
(28)
A work sampling study is being conducted on a loading machine in a warehouse.How many observations should be taken if management wants to be 95% confident the estimate is within
6% of the actual proportion of time the loader is busy if management believes the loading machine is in use 70% of the time?

(Multiple Choice)
4.9/5
(29)
Management believes a critical piece of equipment is busy 85% of the time.How many observations should be taken if management wants to be 98% confident the estimate is within
2.5% of the actual proportion of time the equipment is in use?

(Multiple Choice)
4.9/5
(42)
For a particular time study a company would like to be 90% confident that the average job cycle time is within 5% of the true average job cycle time.Assume that the average job cycle time was 15.76 minutes and the standard deviation of the sample was 3.2 minutes.The number of cycles that should be used in this time study would be
(Multiple Choice)
4.9/5
(32)
Work sampling tends to be more disruptive on the workplace than time studies.
(True/False)
5.0/5
(35)
The normal time to perform a job is calculated by dividing the elemental average by the standard time.
(True/False)
4.9/5
(37)
For a particular time study a company would like to be 95% confident that the average job cycle time is within 2% of the true average job cycle time.Assume that the average job cycle time was 6.53 minutes and the standard deviation of the sample was 1.26 minutes.The number of cycles that should be used in this time study would be
(Multiple Choice)
5.0/5
(35)
Showing 21 - 31 of 31
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)