Exam 3: Statistical Quality Control
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
Tolerances and specifications limits report similar information for a given product design.
Free
(True/False)
4.9/5
(34)
Correct Answer:
True
Possible root causes of special cause variation include all of the following except:
Free
(Multiple Choice)
4.8/5
(27)
Correct Answer:
C
A sequence of sample points that display a pattern is known as a run.
Free
(True/False)
4.9/5
(25)
Correct Answer:
True
Using Excel to construct control charts should be avoided because most people believe using software results in too many errors.
(True/False)
5.0/5
(32)
Which of the following control charts are often based on sample sizes larger than one hundred?
(Multiple Choice)
4.9/5
(30)
In general,a process is considered to be in control for all the following conditions except
(Multiple Choice)
4.7/5
(44)
A company randomly selects 100 light bulbs every day for 40 days from its production process.If 600 defective light bulbs are found in the sampled bulbs then the 3-sigma lower control limit would be
(Multiple Choice)
4.8/5
(34)
If a sample of 40 units of output found 500 defects,then the center line for monitoring the average number of defects per unit of output would be
(Multiple Choice)
4.9/5
(41)
A company manufactures a product that has a design nominal)target width of 5 inches with tolerances of
inch.The process that produces the product has a mean of 4.995 inches and a standard deviation of 0.01 inch.The process capability index for this process is

(Multiple Choice)
4.7/5
(37)
Process control charts are rarely useful for monitoring and controlling the output of service processes.
(True/False)
4.9/5
(31)
A process capability ratio greater than one shows that a process is capable of producing output within its specification limits.
(True/False)
5.0/5
(34)
A process that is determined to be in control contains no variation.
(True/False)
4.9/5
(39)
After special cause variation is detected,the focus changes to identifying the root cause of the variation and eliminating it.
(True/False)
4.7/5
(39)
If the quality of a process's output is determined by the average value of a sample,use an)___________control chart.
(Multiple Choice)
4.9/5
(30)
To monitor the number of blemishes on a polished surface a company randomly selects 10 units of output from its process and counts the number of blemishes on each unit.The sample results are shown below
Given the sample information above,the average number of defects per unit for this process would be

(Multiple Choice)
4.8/5
(28)
To monitor the number of blemishes on a polished surface a company randomly selects 10 units of output from its process and counts the number of blemishes on each unit.The sample results are shown below
Given the sample information above,the standard deviation of the number of defects for this process would be

(Multiple Choice)
4.8/5
(40)
A process capability ratio reflects the number of Z)sigmas included in the range between the upper and lower control limits.
(True/False)
4.9/5
(33)
Variable control charts are used for quantitative measures such as weight or time.
(True/False)
4.8/5
(40)
When monitoring a process's output with a quantitative variable either an R-chart or an
-)chart is used,but never both.

(True/False)
4.9/5
(37)
Showing 1 - 20 of 111
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)