Exam 21: Operational Decision-Making Tools: Work Measurement
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
Work sampling is an easier,cheaper,and quicker approach to work measurement than time study.
Free
(True/False)
4.9/5
(38)
Correct Answer:
True
The basic principle underlying an incentive piece-rate wage system is that workers produced more if they were paid for the additional ouput.
Free
(True/False)
4.9/5
(35)
Correct Answer:
True
Rating worker performance is typically an objective,easy task that can be done by any employee.
Free
(True/False)
4.7/5
(30)
Correct Answer:
False
Workers often do not like to be the subject of a time study and are sometimes unwilling to cooperate.
(True/False)
4.7/5
(36)
The normal times for basic,generic micro motions developed by an outside organization in a laboratory-type environment are referred to as
(Multiple Choice)
4.7/5
(31)
As part of a time study a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported:
Assuming an allowance factor of 20% the standard time for this job would be

(Multiple Choice)
4.9/5
(38)
Determining the length of time it takes to do a job is known as work measurement.
(True/False)
4.9/5
(23)
As part of a time study a particular job was analyzed.The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported:
Assuming an allowance factor of 15% the standard time for this job would be

(Multiple Choice)
4.7/5
(28)
Work sampling is a technique for determining the proportion of time a worker or machine is idle.
(True/False)
4.8/5
(43)
_____________ time is the time required by an "average" worker to perform a job under normal circumstances and conditions.
(Multiple Choice)
4.9/5
(30)
How many observations should be taken to be 90% confident of being within
2% of the actual time a machine is busy if it is believed that the machine is in use 70% of the time?

(Multiple Choice)
4.8/5
(29)
A time study is a statistical sample distribution,where the number of cycles is the sample size.
(True/False)
4.8/5
(37)
As part of its quality-improvement program a company is conducting a time study for a particular job.The time study encompassed 10 job cycles,and the results include the following cumulative times and performance rating factors for each element.An allowance factor of 16% is assumed.
The normal cycle time for this job would be:

(Multiple Choice)
4.9/5
(41)
How many cycles should be used in a time study in order to be 98% confident that the time-study average job cycle time is within 4% of the true average job cycle time.Assume that the average job cycle time was 4.25 minutes and the standard deviation of the sample was 0.65 minutes.
(Multiple Choice)
4.8/5
(36)
The allowance factor is a percentage increase in the normal cycle time.
(True/False)
4.8/5
(34)
Advantages of using a predetermined motion time system include all of the following except
(Multiple Choice)
4.9/5
(27)
As part of its quality-improvement program a company is conducting a time study for a particular job.The time study encompassed 10 job cycles,and the results include the following cumulative times and performance rating factors for each element.
The standard time for this job using an allowance factor of 16% is:

(Multiple Choice)
4.8/5
(23)
How many cycles should be used in a time study in order to be 95% confident that the time-study average job cycle time is within 5% of the true average job cycle time.Assume that the average job cycle time was 2.67 minutes and the standard deviation of the sample was 0.72 minutes.
(Multiple Choice)
4.8/5
(32)