One of Deming's fourteen principles of management includes continuing inspection on a mass basis in order to build quality into the product.

(True/False)
4.7/5
(36)

Ford Motor Company adopted a Japanese approach to quality known in America as _____.

(Multiple Choice)
4.8/5
(33)

The _____ is the average found by summing the values and dividing by the number of values.

(Short Answer)
4.9/5
(37)

Cost of failure includes cost of conformance and cost of appraisal.

(True/False)
4.8/5
(39)

Bins:

(Multiple Choice)
4.8/5
(39)

The _____ is a form for recording the frequency of quality problems.

(Multiple Choice)
5.0/5
(44)

An) _____ is a scatter chart with time on the horizontal axis and measurement scale on the vertical axis, displays the mean and control limits, and may mark two standard deviations from the mean.

(Multiple Choice)
4.8/5
(32)

Because projects are time sensitive, meeting activity finish dates is a common characteristic of quality work on a project that is typical of a requirement of a process manager.

(True/False)
4.7/5
(44)

Because projects are temporary, spotting trends in samples produced by repetitive processes is not as important as considering quality in the planning of the project.

(True/False)
4.9/5
(38)

For normal distributions, about 95.4 percent of the measurements fall within one standard deviation on either side of the mean.