Exam 17: Jit, tps, and Lean Operations
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
________ allows manufacturing work cells and offices to be easily rearranged.
(Short Answer)
4.9/5
(40)
Kanban is associated with all EXCEPT which of the following?
(Multiple Choice)
4.8/5
(30)
________ is the minimum inventory necessary to keep a perfect system running.
(Short Answer)
4.8/5
(40)
Which of the following is TRUE regarding the steps to reducing setup times?
(Multiple Choice)
4.8/5
(34)
With level schedules,a few large batches,rather than frequent small batches,are processed.
(True/False)
4.8/5
(37)
Which of the following is an illustration of employee empowerment?
(Multiple Choice)
4.9/5
(36)
A bakery uses 5 kanban containers that each hold 5 cakes.If daily demand is 20 cakes and lead time is 1 day determine the safety stock.
(Essay)
4.8/5
(43)
The list of 5Ss,although it looks like a housekeeping directive,supports lean production by:
(Multiple Choice)
4.7/5
(48)
If a factory wants to cut its current lot size in half,by what proportion must setup cost change?
(Multiple Choice)
4.9/5
(37)
Which one of the following is not a benefit of JIT implementation?
(Multiple Choice)
4.8/5
(41)
When implemented as a comprehensive operations strategy,JIT,TPS,and lean systems sustain competitive advantage and result in increased overall returns.
(True/False)
4.8/5
(40)
Great Lakes Barge and Baggage Company makes,among other things,battery-operated bilge pumps.Which of the following activities is NOT part of JIT? They:
(Multiple Choice)
4.9/5
(40)
Many suppliers feel that having a variety of customers is better than being tied to long-term contracts with one customer.
(True/False)
4.8/5
(32)
Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days; safety stock is 1/2 day's production.What is the optimum kanban size,and number of kanbans?
(Short Answer)
4.8/5
(42)
In a JIT system,product inspection adds value by identifying defective items.
(True/False)
4.8/5
(43)
Showing 21 - 40 of 115
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)