Exam 9: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
Ambient conditions,spatial layout and functionality,and signs,symbols,and artifacts are all
(Multiple Choice)
4.9/5
(36)
A product-oriented layout would be most appropriate for which one of the following businesses?
(Multiple Choice)
4.7/5
(44)
A product requires 24 separate tasks,and the sum of those task times is 14 minutes;if the cycle time is 2 minutes,then at least 12 workstations will be needed.
(True/False)
4.8/5
(34)
The work cell improves process layouts by reducing floor space and by reducing direct labour cost.
(True/False)
4.9/5
(37)
________ is the maximum time that the product is available at each workstation.
(Essay)
4.9/5
(34)
Four hundred and eighty minutes of production time are available per day.Scheduled production is 120 units per day.What is the required cycle time?
(Multiple Choice)
4.8/5
(30)
The most common tactic followed in process-layout planning is to arrange departments or work centers so they
(Multiple Choice)
4.9/5
(40)
A(n)________ line is a machine-paced product-oriented facility for building components.
(Essay)
4.7/5
(30)
Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes.
a.Draw the precedence diagram for the set of tasks.
b.Calculate the theoretical minimum number of workstations.
c.Balance this line using the longest task time heuristic.
d.What tasks are assigned to which stations?
e.Does the solution have the minimum number of stations? Explain.
f.How much idle time is there,summed over all workstations?
g.What is the efficiency of this line?


(Essay)
4.8/5
(35)
A company is designing a product layout for a new product.It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day.The tasks necessary to produce this product are detailed in the table below.
a.Draw the network described in the table.
b.Without regard to a production schedule,what is the minimum possible cycle time (in seconds)for this situation;what is the maximum?
c.What is the required cycle time (in seconds)in order to meet the schedule?
d.What is the theoretical minimum number of workstations needed to meet the schedule?
e.Balance this line using longest processing time.
f.What is the efficiency of the balance obtained in part e?

(Essay)
4.8/5
(43)
________ is that element of balancing a work cell that superficially resembles cycle time.
(Essay)
4.8/5
(36)
What is a servicescape? How is it related to the retail layout problem? What are the three elements of servicescape for dealing with these human issues?
(Essay)
4.9/5
(38)
"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?
(Multiple Choice)
4.8/5
(38)
What is the role of heuristics in solving layout problems? Provide a brief example,drawing from manufacturing situations,retailing situations,or other service situations.
(Essay)
4.8/5
(30)