Exam 19: Capacity and Constraint Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Describe how EMV might be used to analyse a capacity decision.

(Essay)
4.8/5
(36)

Adding a complementary product to what is currently being produced is a demand management strategy used when

(Multiple Choice)
4.7/5
(37)

TOC strives to reduce the effect of constraints by

(Multiple Choice)
4.7/5
(39)

Break-even is the number of units at which

(Multiple Choice)
4.9/5
(36)

Which of the following represents an aggressive approach to demand management in the service sector when demand and capacity are not particularly well matched?

(Multiple Choice)
4.9/5
(31)

To find the process cycle time with simultaneous processes,compute the time over all paths and choose the shortest path through the system.

(True/False)
4.8/5
(42)

What is the fundamental distinction between design capacity and effective capacity? Provide a brief example.

(Essay)
4.9/5
(51)

Explain the importance of a bottleneck operation in a production sequence.

(Essay)
4.9/5
(44)

Basic break-even analysis typically assumes that

(Multiple Choice)
4.8/5
(37)

A product sells for $5,and has unit variable costs of $3.This product accounts for $20,000 in annual sales,out of the firm's total of $60,000.When performing multiproduct break-even analysis,the weighted contribution of this product is approximately

(Multiple Choice)
4.8/5
(32)

________ analysis finds the point at which costs equals revenues.

(Essay)
5.0/5
(46)

The three main strategies for increasing capacity are

(Multiple Choice)
4.7/5
(37)

A graphic design studio is considering three new computers.The first model,A,costs $5000.Model B and C cost $3000 and $1000 respectively.If each customer provides $50 of revenue and variable costs are $20/customer,find the number of customers required for each model to break even.

(Essay)
4.7/5
(39)

In "drum,buffer,rope," the ________ acts like kanban signals.

(Essay)
4.9/5
(33)

A factory outputs 1000 units a month.If design capacity is 3000 and efficiency is 50% find utilization and effective capacity.

(Essay)
4.7/5
(40)

An organization whose capacity is on that portion of the average unit cost curve that falls as output rises

(Multiple Choice)
4.8/5
(34)

Advantage Milling Devices is preparing to buy a new machine for precision milling of special metal alloys.This device can earn $300 per hour,and can run 3,000 hours per year.The machine is expected to be this productive for four years.If the interest rate is 6%,what is the present value? What is the present value if the interest rate is not 6%,but 9%? Why does present value fall when interest rates rise?

(Essay)
4.8/5
(29)

Consider a production line with five stations.Station 1 can produce a unit in 9 minutes.Station 2 can produce a unit in 10 minutes.Station three has two identical machines,each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines).Station 4 can produce a unit in 5 minutes.Station 5 can produce a unit in 8 minutes.Which station is the bottleneck station?

(Multiple Choice)
4.8/5
(28)

The basic break-even model can be modified to handle more than one product.This extension of the basic model requires

(Multiple Choice)
4.8/5
(41)

Lag and straddle strategies for increasing capacity have what main advantage over a leading strategy?

(Multiple Choice)
4.8/5
(43)
Showing 81 - 100 of 107
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)