Exam 26: Learning Curves
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
The first unit took 10 hours and the fourth unit took 8.1 hours to complete.What is the learning curve?
(Multiple Choice)
4.8/5
(33)
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,estimate (using the doubling approach)how long it will take to complete the third unit.
(Essay)
4.8/5
(31)
Failure to consider the effects of learning can lead to ________ of labor needs.
(Essay)
4.8/5
(40)
A 90% learning curve implies that each time the production volume is doubled,the direct time per unit is reduced to 90% of its previous value.
(True/False)
4.8/5
(33)
Learning curves can be applied to a variety of purposes internal to a firm,including:
(Multiple Choice)
4.8/5
(36)
A company is preparing a bid on a government contract for 40 units of a certain product.The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.3 hours,respectively.
a.What is the appropriate learning curve?
b.What is the average time per unit for the 40 units?
c.Which unit,if any,will require approximately one-half the time of the first unit?
(Essay)
4.8/5
(37)
A project manager bases his time and labor estimates on a learning curve of 86%.The actual learning curve turns out to be 89%.The manager,because of the decreased learning,will complete his project in more time and with more labor use than his estimate suggested.
(True/False)
4.9/5
(35)
The fact that human activities typically improve when they are done on a repetitive basis is described by a:
(Multiple Choice)
4.8/5
(34)
It took 18 hours to complete the first two products with an 80% learning curve.How long did the second product take?
(Multiple Choice)
5.0/5
(36)
A manager is trying to estimate the appropriate learning curve for a certain job.The manager notes that the first four units had a total time of 30 minutes.Which learning curve would yield approximately this result if the first unit took 9 minutes? (Use Table E.3. )
(Multiple Choice)
4.8/5
(35)
A product was priced assuming an 80% learning curve.How much extra labor (in $)will be required on the 4th product if the learning curve is actually 90%? Assume that the first unit cost $100 to produce.
(Essay)
4.8/5
(41)
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the formula approach. )
(Multiple Choice)
4.9/5
(30)
Your firm has expertise with a special type of hand-finished furniture.The learning curve is known to be 82%.If the first piece of furniture took 6 hours,how long will it take to make the second? How long will it take to make the fourth?
(Essay)
4.7/5
(33)
The first unit of a product took 1,000 hours to build and the learning curve is 85%.How long will it take to make the first 5 units? (Use Table E.3)
(Multiple Choice)
4.9/5
(41)
Your company is making experimental turbochargers for a new design of high-powered farm tractors.The production schedule for these new components is contained in the table below.
The first turbocharger,a trial unit,took 900 hours to produce.Based on your experience with similar products,the learning curve is 85%.You have 20 employees,and each employee works 160 hours per month.How many hours will be required in each month? In which month(s)will overtime be required to meet the production schedule?

(Essay)
4.8/5
(30)
If the learning curve for a process is 80 percent,that same process has a 20 percent ________.
(Essay)
4.8/5
(41)
Which of the following statements is most appropriate with respect to a 70% learning curve?
(Multiple Choice)
4.8/5
(40)
Showing 21 - 40 of 110
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)