Exam 23: Linear Programming Models
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Linear programming helps operations managers make decisions necessary to make effective use of resources such as machinery,labor,money,time,and raw materials.
(True/False)
4.8/5
(37)
Suppose that the shadow price for assembly time is $5/hour.The allowable increase for the assembly time constraint is 40 hours,and the allowable decrease is 30 hours.If all assembly hours were used under the initial LP solution and workers normally make $4/hour but can work overtime for $6/hour,what should management do?
(Multiple Choice)
4.7/5
(43)
In linear programming,if there are three constraints,each representing a resource that can be used up,the optimal solution must use up all of each of the three resources.
(True/False)
4.9/5
(31)
A linear programming problem contains a restriction that reads "the quantity of X must be at least three times as large as the quantity of Y." Which of the following inequalities is the proper formulation of this constraint?
(Multiple Choice)
4.9/5
(32)
In linear programming,a statement such as "maximize contribution" becomes an objective function when the problem is formulated.
(True/False)
4.8/5
(38)
In linear programming,statements such as "the blend must consist of at least 10% of ingredient A,at least 30% of ingredient B,and no more than 50% of ingredient C" can be made into valid constraints even though the percentages do not add up to 100 percent.
(True/False)
4.8/5
(40)
What is the region that satisfies all of the constraints in linear programming called?
(Multiple Choice)
4.9/5
(38)
Which of the following is an algorithm for solving linear programming problems of all sizes?
(Multiple Choice)
4.8/5
(34)
________ is an analysis that projects how much a solution might change if there were changes in the variables or input data.
(Essay)
4.8/5
(41)
In a linear programming formulation,a statement such as "maximize contribution" becomes a(n):
(Multiple Choice)
4.8/5
(36)
Two methods of conducting sensitivity analysis on solved linear programming problems are ________ and ________.
(Essay)
4.8/5
(31)
The ________ is the set of all feasible combinations of the decision variables.
(Essay)
4.8/5
(32)
What combination of a and b will yield the optimum for this problem? Maximize $6a + $15b,subject to (1)4a + 2b ≤ 12 and (2)5a + 2b ≤ 20 and (3)x,y ≥ 0.
(Multiple Choice)
4.7/5
(34)
Suppose that the feasible region of a maximization LP problem has corners of (0,0), (5,0),and (0,5).How many possible combinations of X and Y will yield the maximum profit if profit is given to be 5X + 5Y?
(Multiple Choice)
4.7/5
(33)
Which of the following sets of constraints results in an unbounded maximization problem?
(Multiple Choice)
4.9/5
(32)
The feasible region in the diagram below is consistent with which one of the following constraints? 

(Multiple Choice)
4.9/5
(27)
Which of the following is not a requirement of a linear programming problem?
(Multiple Choice)
5.0/5
(32)
What combination of x and y will yield the optimum for this problem? Maximize $3x + $15y,subject to (1)2x + 4y ≤ 12 and (2)5x + 2y ≤ 10 and (3)x,y ≥ 0.
(Multiple Choice)
4.7/5
(39)
Phil Bert's Nuthouse is preparing a new product,a blend of mixed nuts.The product must be at most 50 percent peanuts,must have more almonds than cashews,and must be at least 10 percent pecans.The blend will be sold in one-pound bags.Phil's goal is to mix the nuts in such a manner that all conditions are satisfied and the cost per bag is minimized.Peanuts cost $1 per pound.Cashews cost $3 per pound.Almonds cost $5 per pound and pecans cost $6 per pound.Formulate this problem as a linear program.
(Essay)
4.9/5
(37)
The optimal solution to a linear programming problem lies within the feasible region.
(True/False)
4.8/5
(38)
Showing 41 - 60 of 88
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)