Exam 3: Process Strategy
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
A primary enabler of process reengineering is:
Free
(Multiple Choice)
4.8/5
(29)
Correct Answer:
C
Use the following to answer the questions below.
You currently purchase a part used in your production process from an outside supplier,and have decided to begin making this part in-house.You have two equipment options for moving production in-house: special-purpose equipment and general-purpose equipment.Cost information for these two options is as follows:
-Refer to the instruction above.At an annual requirement of 40,000 units,what does the company save per year by selecting the low-cost option?

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
C
Reengineering is the fundamental rethinking and radical redesign of processes to improve performance dramatically.
Free
(True/False)
4.9/5
(31)
Correct Answer:
True
The product-process matrix used to analyze manufacturing operations brings together the elements of:
(Multiple Choice)
4.9/5
(26)
A make-to-stock strategy involves holding items in stock for immediate delivery and is feasible for standardized products with high volumes and reasonably accurate forecasts.
(True/False)
4.8/5
(38)
Under which one of the following environments would you opt for a higher degree of resource flexibility?
(Multiple Choice)
4.7/5
(33)
________ reflects the ways in which customers become part of the process and the extent of their participation.
(Essay)
4.9/5
(37)
Which one of the following statements concerning the role of process reengineering is best?
(Multiple Choice)
4.8/5
(31)
A manufacturer that produces standard products in large volumes is likely to be using a(n):
(Multiple Choice)
4.9/5
(38)
A politician conducting a town hall meeting is an example of:
(Multiple Choice)
4.8/5
(31)
In a line process,there is little variability in the products manufactured,and production and material handling equipment are often specialized.
(True/False)
4.8/5
(23)
A team consisting of members from each functional area affected by the process change is referred to as a(n):
(Multiple Choice)
4.8/5
(28)
Use the following to answer the questions below.
A company is considering two options for the production of a part needed downstream in the manufacturing process.Particulars are as follows:
-Refer to the instruction above.What is the monthly break-even quantity for choosing between the two automation approaches?

(Multiple Choice)
4.7/5
(37)
High customer involvement increases service provider productivity and makes quality measurement easier.
(True/False)
4.7/5
(33)
Use the following to answer the questions below.
Acme Machine is a job shop that makes specialty parts for the airline industry.Figure #1 below shows the block plan for key manufacturing operations in its current facility.Acme believes there may be a way to reduce the total distance traveled between departments.Consider the two revisions that have been suggested,based on the closeness matrix shown below the block plans.The aisles are shown by the dotted lines in Figure 1.
-If travel between departments is restricted to the aisles shown in Figure 1,what is the total weighted-distance (wd)score for the block plan shown in Figure 1?


(Multiple Choice)
4.7/5
(43)
Service providers with a line process tend to move customers,materials,or information in a fixed sequence from one operation to the next.
(True/False)
4.8/5
(39)
________ is the ease with which employees and equipment can handle a wide variety of products,output levels,duties,and functions.
(Essay)
4.8/5
(29)
A firm that uses large batch,line,or continuous-flow process most likely have:
(Multiple Choice)
4.7/5
(41)
Showing 1 - 20 of 149
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)