Exam 9: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting142 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Process Strategy129 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources, Job Design, and Work Measurement191 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrp and Erp172 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Just-In-Time and Lean Options138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Tools for Managers97 Questions
Exam 19: Acceptance Sampling99 Questions
Exam 20: The Simplex Method of Linear Programming94 Questions
Exam 21: The Modi and Vam Methods of Solving Transportation Problems135 Questions
Exam 22: Vehicle Routing and Scheduling111 Questions
Exam 23 Managing Quality155 Questions
Exam 24: Process Strategy107 Questions
Exam 25: Supply-Chain Management73 Questions
Exam 26: Vehicle Routing and Scheduling92 Questions
Select questions type
A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts.
a. Draw a network diagram of precedence relationships.
b. Compute the required cycle time per unit in seconds.
c. Compute the minimum number of workstations required to produce 600 units per day.
d. Balance this line using longest processing time.
e. What is the efficiency of the line obtained in part d?

(Essay)
4.7/5
(29)
Which one of the following is not common to repetitive and product-oriented layouts?
(Multiple Choice)
4.8/5
(43)
An insurance claims processing center has six work centers, any of which can be placed into any of six physical departmental locations. Call the centers 1, 2, 3, 4, 5, and 6, and the departments A, B, C, D, E, and F. The current set of assignments is A-3, B-1, C-6, D-2, E-4, and F-5.
The (symmetric) matrix of departmental distances, in meters is
The matrix of work flow (estimated trips per day) is among centers
The firm estimates that each trip costs approximately $4.
a. What is the cost of the current assignment?
b. Use trial-and-error to find one improved assignment.
c. What is that assignment, and what is its cost?


(Essay)
4.9/5
(38)
A production line is to be designed for a product whose completion requires 21 minutes of work. The factory works 400 minutes per day. Can an assembly line with five workstations make 100 units per day?
(Multiple Choice)
4.8/5
(38)
The major problem addressed by the process-oriented layout strategy is
(Multiple Choice)
4.8/5
(31)
Explain how a load-distance model helps solve problems in process layout.
(Essay)
4.8/5
(34)
The work cell improves process layouts by reducing floor space and by reducing direct labor cost.
(True/False)
4.8/5
(31)
In what specific areas does the layout decision establish a firm's competitive priorities?
(Essay)
4.8/5
(32)
Which of the following is true for process layouts, but false for product-oriented layouts?
(Multiple Choice)
4.8/5
(33)
McDonald's "Made for You" kitchen system represents a __________ use of layout decisions.
(Short Answer)
4.8/5
(36)
If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day, the maximum cycle time would be 4 minutes.
(True/False)
4.8/5
(39)
Servicescape refers to the physical surrounding in which the service is delivered.
(True/False)
5.0/5
(29)
An assembly line with 11 tasks is to be balanced. The longest task is 2.4 minutes, the shortest task is 0.4 minutes, and the sum of the task times is 18 minutes. The line will operate for 600 minutes per day.
a. Determine the minimum and maximum cycle times.
b. What range of output is theoretically possible for the line?
c. What is the minimum number of stations needed if the maximum output rate is to be sought?
d. What cycle time will provide an output rate of 200 units per day?
(Essay)
5.0/5
(35)
A production line is to be designed to make 500 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factory operates 750 minutes per day. The required cycle time for this assembly line is
(Multiple Choice)
4.8/5
(37)
The major problem addressed by the warehouse layout strategy is
(Multiple Choice)
4.8/5
(31)
Showing 21 - 40 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)