Exam 9: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Job lots are groups or batches of parts processed together.

(True/False)
4.8/5
(40)

A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts. A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts.    a. Draw a network diagram of precedence relationships. b. Compute the required cycle time per unit in seconds. c. Compute the minimum number of workstations required to produce 600 units per day. d. Balance this line using longest processing time. e. What is the efficiency of the line obtained in part d? a. Draw a network diagram of precedence relationships. b. Compute the required cycle time per unit in seconds. c. Compute the minimum number of workstations required to produce 600 units per day. d. Balance this line using longest processing time. e. What is the efficiency of the line obtained in part d?

(Essay)
4.7/5
(29)

A disadvantage of product-oriented layout is that

(Multiple Choice)
4.8/5
(37)

Which one of the following is not common to repetitive and product-oriented layouts?

(Multiple Choice)
4.8/5
(43)

An insurance claims processing center has six work centers, any of which can be placed into any of six physical departmental locations. Call the centers 1, 2, 3, 4, 5, and 6, and the departments A, B, C, D, E, and F. The current set of assignments is A-3, B-1, C-6, D-2, E-4, and F-5. The (symmetric) matrix of departmental distances, in meters is An insurance claims processing center has six work centers, any of which can be placed into any of six physical departmental locations. Call the centers 1, 2, 3, 4, 5, and 6, and the departments A, B, C, D, E, and F. The current set of assignments is A-3, B-1, C-6, D-2, E-4, and F-5. The (symmetric) matrix of departmental distances, in meters is    The matrix of work flow (estimated trips per day) is among centers    The firm estimates that each trip costs approximately $4. a. What is the cost of the current assignment? b. Use trial-and-error to find one improved assignment. c. What is that assignment, and what is its cost? The matrix of work flow (estimated trips per day) is among centers An insurance claims processing center has six work centers, any of which can be placed into any of six physical departmental locations. Call the centers 1, 2, 3, 4, 5, and 6, and the departments A, B, C, D, E, and F. The current set of assignments is A-3, B-1, C-6, D-2, E-4, and F-5. The (symmetric) matrix of departmental distances, in meters is    The matrix of work flow (estimated trips per day) is among centers    The firm estimates that each trip costs approximately $4. a. What is the cost of the current assignment? b. Use trial-and-error to find one improved assignment. c. What is that assignment, and what is its cost? The firm estimates that each trip costs approximately $4. a. What is the cost of the current assignment? b. Use trial-and-error to find one improved assignment. c. What is that assignment, and what is its cost?

(Essay)
4.9/5
(38)

A production line is to be designed for a product whose completion requires 21 minutes of work. The factory works 400 minutes per day. Can an assembly line with five workstations make 100 units per day?

(Multiple Choice)
4.8/5
(38)

The major problem addressed by the process-oriented layout strategy is

(Multiple Choice)
4.8/5
(31)

Explain how a load-distance model helps solve problems in process layout.

(Essay)
4.8/5
(34)

The work cell improves process layouts by reducing floor space and by reducing direct labor cost.

(True/False)
4.8/5
(31)

In what specific areas does the layout decision establish a firm's competitive priorities?

(Essay)
4.8/5
(32)

Balancing a work cell is done

(Multiple Choice)
4.8/5
(40)

Which of the following is true for process layouts, but false for product-oriented layouts?

(Multiple Choice)
4.8/5
(33)

McDonald's "Made for You" kitchen system represents a __________ use of layout decisions.

(Short Answer)
4.8/5
(36)

If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day, the maximum cycle time would be 4 minutes.

(True/False)
4.8/5
(39)

Servicescape refers to the physical surrounding in which the service is delivered.

(True/False)
5.0/5
(29)

An assembly line with 11 tasks is to be balanced. The longest task is 2.4 minutes, the shortest task is 0.4 minutes, and the sum of the task times is 18 minutes. The line will operate for 600 minutes per day. a. Determine the minimum and maximum cycle times. b. What range of output is theoretically possible for the line? c. What is the minimum number of stations needed if the maximum output rate is to be sought? d. What cycle time will provide an output rate of 200 units per day?

(Essay)
5.0/5
(35)

Which of the following is true of a focused factory?

(Multiple Choice)
4.9/5
(38)

A big advantage of a process-oriented layout is

(Multiple Choice)
4.7/5
(33)

A production line is to be designed to make 500 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factory operates 750 minutes per day. The required cycle time for this assembly line is

(Multiple Choice)
4.8/5
(37)

The major problem addressed by the warehouse layout strategy is

(Multiple Choice)
4.8/5
(31)
Showing 21 - 40 of 161
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)