Exam 14: Material Requirements Planning Mrpand Erp
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
When safety stock is deemed absolutely necessary,the usual policy is to build it into (increase)the inventory requirement of the MRP logic.
Free
(True/False)
4.9/5
(36)
Correct Answer:
True
The large parts of a playground A-frame (from which to hang a swing or glider)consist of a ridge pole,four legs,and two side braces.Each pair of legs fastens to the ridge with one fastener set.Each side brace requires two fastener sets for attachment to the legs.Each fastener set includes one zinc-plated bolt,one lock-washer,and one nut.
There is one order outstanding,to make 80 frame kits.There are 200 legs in inventory.There are no other large items in inventory,and no scheduled receipts.Fasteners are available from the small parts area.
a.Draw the product structure tree
b.Calculate the net requirements to fulfill the outstanding order.
Free
(Essay)
4.9/5
(42)
Correct Answer:
Solution:
Jacquie Welkener,operations manager for ABC Technologies,must schedule work for the next five days.Each unit takes 30 minutes to process.Available capacity is 8 hours per day.The production order quantities are 12,18,20,13,and 17 for Monday through Friday,respectively.What should be the production plan?
Free
(Essay)
4.9/5
(22)
Correct Answer:
Sixteen units should be produced each day.Thus,4 units should be moved from Tuesday to Monday,2 units should be moved from Wednesday to Tuesday,2 units should be moved from Wednesday to Thursday,and 1 unit should be moved from Friday to Thursday.
In MRP,a "bucket" refers to a fixed order quantity,such as an EOQ.
(True/False)
4.8/5
(24)
DRP is a time-phased stock-replenishment plan for all levels of a distribution network.
(True/False)
4.9/5
(28)
Consider the following product structure.
If the demand for product A is 50 units,how many units of component E will be needed?

(Multiple Choice)
4.7/5
(39)
Consider the following product structure.Forty units of Product A are needed.How many units of B,C,D,E,F,and G are needed? 

(Essay)
4.8/5
(37)
An order has been placed for 50 units of Product A and 60 units of Product B.There are currently 35 units of Product B on hand.Each A requires 2 units of Part C;each B requires 5 units of C.There are 160 units of C available.
(a)Calculate the net requirements for B.
(b)Calculate the gross requirements for C.
(c)Calculate the net requirements for C.
(Essay)
4.8/5
(39)
What does enterprise resource planning (ERP)allow an organization to do?
(Essay)
4.8/5
(30)
Gross material requirements do not take into account the amount of inventory on hand.
(True/False)
4.7/5
(42)
A(n)________ can illustrate whether a work center has been scheduled beyond its capacity.
(Essay)
5.0/5
(38)
Consider the bill of material for Product J and the data given in the following table.The gross requirements for J are 200 units in week 6 and 250 units in week 8.Develop the MRP tables for each item for an 8-week planning period.Use the lot-for-lot lot-sizing rule.



(Essay)
4.8/5
(33)
The supply-chain systems that result from using ERP in the grocery industry are called efficient consumer response (ECR)systems.
(True/False)
4.8/5
(35)
Dependent demand and independent demand items differ in that:
(Multiple Choice)
4.9/5
(30)
A manufacturing company is trying to determine the cost of materials used to produce an A.If Fs cost $1 and Ds cost $2 how much does it cost to produce an A (in F and D materials only)? 

(Essay)
4.8/5
(40)
Which of the following statements regarding Wheeled Coach is FALSE?
(Multiple Choice)
4.8/5
(31)
Showing 1 - 20 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)