Exam 3: Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A combination of effective Gantt chart use and other tactics allowed Delta to cut the average time for a plane layover by what % of the original 60 minute duration?

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

A

The beta distribution is used in project management to:

Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
Verified

E

A network consists of the activities in the following list.Times are given in weeks. A network consists of the activities in the following list.Times are given in weeks.    a.Draw the network diagram. b.Calculate the ES,EF,LS,LF,and Slack for each activity. c.What is project completion time? a.Draw the network diagram. b.Calculate the ES,EF,LS,LF,and Slack for each activity. c.What is project completion time?

Free
(Essay)
4.8/5
(36)
Correct Answer:
Verified

(a) (a)   (b,c)   (b,c)
(a)   (b,c)

Ethical issues that may arise in projects large and small include:

(Multiple Choice)
4.8/5
(35)

Which of the following projects were completed by Bechtel?

(Multiple Choice)
4.7/5
(37)

A simple CPM network has three activities,A,B,and C.A is an immediate predecessor of B and of C.B is an immediate predecessor of C.The activity durations are A=4,B=3,C=8.

(Multiple Choice)
4.9/5
(38)

Pirmin's Bike Shop is behind on a custom bike and needs to crash 8 hours of time from the 8-step project.Given the project table below calculate the crash cost for 8 hours of time-savings.Suppose Pirmin calls the customer and asks for a project extension,reducing the amount of time he needs to crash.Calculate both the maximum time-savings available on a $25 crash budget and the cost to crash four hours of savings. Pirmin's Bike Shop is behind on a custom bike and needs to crash 8 hours of time from the 8-step project.Given the project table below calculate the crash cost for 8 hours of time-savings.Suppose Pirmin calls the customer and asks for a project extension,reducing the amount of time he needs to crash.Calculate both the maximum time-savings available on a $25 crash budget and the cost to crash four hours of savings.

(Essay)
4.9/5
(32)

Which of the following statements regarding PERT times is true?

(Multiple Choice)
4.8/5
(38)

What are some of the ethical issues faced by project managers?

(Essay)
4.7/5
(36)

What is a project organization?

(Essay)
4.8/5
(42)

Three critical path activities are candidates for crashing on a CPM network.Activity details are in the table below. Three critical path activities are candidates for crashing on a CPM network.Activity details are in the table below.    a.What is the crash cost per unit time for each of the three activities? b.Which activity should be crashed first to cut one day from the project's duration;how much is added to project cost? c.Which activity should be the next activity crashed to cut a second day from the project's duration;how much is added to project cost? a.What is the crash cost per unit time for each of the three activities? b.Which activity should be crashed first to cut one day from the project's duration;how much is added to project cost? c.Which activity should be the next activity crashed to cut a second day from the project's duration;how much is added to project cost?

(Essay)
4.9/5
(39)

What are the three phases of a project? Describe each in a sentence or two.

(Essay)
4.9/5
(44)

Which of the following is NOT a limitation of PERT?

(Multiple Choice)
4.7/5
(37)

The time an activity will take assuming very unfavorable conditions is:

(Multiple Choice)
4.7/5
(36)

A contractor's project being analyzed by PERT has an estimated time for the critical path of 120 days.The sum of all activity variances is 81;the sum of variances along the critical path is 64.What is the probability that the project will take 130 or more days to complete?

(Multiple Choice)
4.9/5
(29)

In project management,crashing an activity must consider the impact on all paths in the network.

(True/False)
4.8/5
(37)

Ethical issues that can arise in projects include gifts from contractors,pressure to mask delays with false status reports,and pressure to compromise project quality to meet bonuses or avoid penalties related to schedules.

(True/False)
4.8/5
(33)

A project manager is interested in crashing a project with variable activity times.Which of the following tools should he/she employ?

(Multiple Choice)
4.9/5
(36)

The beta distribution is used in project management to:

(Multiple Choice)
4.9/5
(30)

Work breakdown structure is a useful tool in project management because it addresses the timing of individual work elements.

(True/False)
4.9/5
(32)