Exam 16: Jit,tps,and Lean Operations
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
In JIT partnerships,suppliers have several concerns.Which of the following is NOT such a concern?
Free
(Multiple Choice)
4.7/5
(41)
Correct Answer:
E
Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of ½ a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans?
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
E
How can a reduction of in-transit inventory be encouraged?
Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
A
In a JIT system,product inspection adds value by identifying defective items.
(True/False)
4.8/5
(37)
The ________ is the time between the arrival of raw materials and the shipping of finished products.
(Essay)
4.7/5
(28)
Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup.


(Essay)
4.9/5
(41)
Hidden problems are generally uncovered during the process of reducing inventory.
(True/False)
4.9/5
(36)
When implemented as a comprehensive operations strategy,JIT,TPS,and lean systems sustain competitive advantage and result in increased overall returns.
(True/False)
4.8/5
(35)
A firm wants to develop a level material use schedule based on the following data.What should be the setup cost? 

(Multiple Choice)
4.9/5
(33)
The number of kanbans should be equal to which of the following?
(Multiple Choice)
4.8/5
(49)
________ involve scheduling products so that each day's production meets the demand for that day.
(Essay)
4.9/5
(33)
Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?
(Multiple Choice)
5.0/5
(42)
Which one of the following is not a benefit of JIT implementation?
(Multiple Choice)
4.8/5
(40)
Increasing inventory exposes variability in production processes.
(True/False)
4.9/5
(48)
When suppliers are encouraged to locate near manufacturing plants,the goal of the JIT partnership is to reduce ________ inventory.
(Essay)
4.8/5
(34)
Employee empowerment is unnecessary in the Toyota Production System,because automation and powerful information systems reduce the need for employee creativity and decision making.
(True/False)
4.7/5
(29)
Customer demand will always remain an unknown,so it is not considered a source of variability.
(True/False)
4.8/5
(43)